energyNP.com  
Tel
98510-91900¡¡
Email

Er.energyNP@Gmail.com

      ¡¡ energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Lead Acid Battery
¡¡LiFePO4 Battery
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  New Directive Introduced to Promote Reservoir-Based Hydropower Projects

The government has issued a new directive to systematize and make investment-friendly the buying and selling of electricity produced from reservoir-based hydropower projects. The Electricity Regulatory Commission has issued the ¡°Directive on the Purchase and Sale of Electricity from Reservoir-Based Power Generation Centers, mid-April 2025 to mid-April 2026, which provides clear provisions on electricity purchase rates, cost calculation, energy scheduling, and risk management.

The purchase and sale rate of electricity generated from reservoir-based power generation centers has been set at a minimum of NPR 8.45 per unit and a maximum of NPR 14.80 per unit. The Commission has stipulated that, for reservoir-based projects with a capacity of up to 100 megawatts, applications for agreements may be submitted only with a proposal in which the annual average electricity purchase and sale rate during the monsoon season is NPR 8.45 per unit, and the rate during the dry season does not exceed NPR 14.80 per unit.

According to the directive, electricity generated from reservoir-based projects will be purchased through single-part and two-part tariff systems. Under the two-part system, the electricity purchase rate will be calculated separately as a capacity charge and an energy charge.

The directive states that the capacity charge will include costs such as loan principal and interest and foreign currency exchange expenses, while the energy charge will cover costs including operation and maintenance, royalty, and income tax.

The directive has also established a formula for determining separate electricity purchase rates for the monsoon and dry seasons. However, the purchase rate for electricity generated using water that must be continuously released due to environmental flow requirements or other reasons will be equivalent to that of run-of-river projects.

Similarly, it is stated that after the completion of the long-term loan repayment period, electricity produced from reservoir-based projects will be purchased only through the single-part tariff system. This provision is expected to reduce the financial risk of projects and ensure long-term stability.

Urjasanchar

[ 11 February 2026 / nepalenergyforum.com ]¡¡¡¡¡¡
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries