energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Myagdi 25MW Hydropower Project Work Restarts After Month-Long Protest

The obstruction to the construction of the 25 MW Darbang Myagdi Khola Hydropower Project, currently under construction in the Malika and Dhaulagiri Rural Municipalities of Myagdi, has ended today after one month.

Residents of Dhaulagiri Rural Municipality had halted the project’s construction since Poush 25 (January 9) due to the failure to begin the construction of a bridge over the Dang Khola, located at the border of Malika Rural Municipality-5 and Dhaulagiri Rural Municipality-7 along the Darbang-Dang Khola-Dharapani-Takum-Muna-Lulang-Gurja road, six years after the contract was signed. The project is promoted by Dhaulagiri Kalika Hydro Limited.

Resham Pun Magar, Vice-Chairperson of Dhaulagiri Rural Municipality, informed that since assurance has been given that the construction of the motorable bridge will commence within the current fiscal year as per the demands of the local residents, a decision was made in consultation with the political parties and local leaders involved in the protest to withdraw the agitation and cooperate in resuming the hydropower project construction work.

Harkaman Magar, Managing Director of Dhaulagiri Kalika Hydro, committed to starting and completing the bridge construction as soon as possible after completing the legal procedures. The contract for the bridge construction over the Dang Khola was signed between the Infrastructure Development Office, Myagdi, and Indreni-Fewa JV Pokhara on Jestha 22, BS 2076 (June 5, 2019) for NPR 19,329,457.

When preparations were underway to start the 18-meter long motorable bridge construction, which was targeted for completion on Jestha 20, BS 2077 (June 2, 2020), it was agreed that the provincial government would be requested to build the bridge 200 meters upstream from the proposed location as it fell within the submergence area of the Darbang Myagdi Khola Hydropower Project’s dam. If the government agency did not build the bridge, the project itself would construct it.

The construction of the bridge could not commence because the contractor went to court citing reasons such as the hydropower project not allowing work to proceed on time. Therefore, the locals had halted the construction of the hydropower project as a form of pressure until the bridge construction began.

The temporary motorable bridge constructed by Dhaulagiri Rural Municipality over the Dang Khola in BS 2075 (2018/2019) has become dilapidated, causing transportation difficulties for residents of Gurja, Lulang, Muna, Modi, and Takum due to the lack of a new bridge.

[ 12 February 2026 / nepalenergyforum.com ]   
 

Lithium Iron Phoaphate (Lifepo4) Battery - Wall Mounted Energy Storage Lithium Battery - Nepal - Kathmandu

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries