energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Tanahun Hydropower: Tree Marking Starts for 220kV Damauli–Bharatpur Line

Tree marking has begun in forest areas required for the construction of the transmission line under the Tanahun Hydropower Project. According to Project Chief Shyamji Bhandari, trees located within the right-of-way of the 220 kV Damauli–Bharatpur transmission line under Package 3, particularly in the national forest areas of Chitwan district, are being identified and marked.

An agreement has already been reached with the Department of Forests and Soil Conservation to use forest land within the transmission line corridor and to clear vegetation where towers will be constructed. Accordingly, usage rights have been obtained for approximately 92.7 hectares of forest land across Tanahun and Chitwan districts, along with permission to remove 9,127 trees.

Under this package, India’s KEC International Limited is constructing the 33-kilometer-long transmission line. Out of a total of 94 towers, foundation work has been completed for 78 towers, and installation has been completed for 69 towers. Overall progress of this package has reached around 76 percent.

Work on the other two packages of the project is also progressing rapidly. Under Package 1, the dam construction has been awarded to Songda Kalika JV, where overall progress has reached 54 percent so far. Excavation of the hill required for the main dam, construction of access roads, and the building of a temporary dam and diversion tunnel to reroute the Seti River have already been completed. The Seti River was diverted on November 6, 2023 (Kartik 20, 2080 BS), and the temporary dam construction was completed by May–June 2024 (Jestha 2081 BS).

Similarly, under Package 2, the powerhouse construction and equipment installation are being carried out by the Chinese company Sinohydro Corporation. Excavation of underground structures has been completed, and most of the civil construction work is finished. Major concreting works for the powerhouse, cable tunnel, surge tank, and tailrace structures have already been completed. Overall progress of this package has reached 73 percent.

Currently, the civil construction of the powerhouse has reached its final stage, while electromechanical installation work is ongoing. In addition, roofing and drainage works are also in progress.

Urjasanchar

[ 27 March 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries