energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  100 MW pumped storage hydropower project planned in Makwanpur

Proposed site of the Kulekhani-Sisneri pumped storage hydropower project and the Kulekhani reservoir in Indrasarovar Rural Municipality, Makwanpur.

Preparations have begun for the construction of a 100 MW pumped storage hydropower project in Makwanpur.

The Nepal Electricity Authority (NEA) is moving forward with plans to develop the Kulekhani-Sisneri pumped storage hydropower project in Indrasarovar Rural Municipality. The proposed project is expected to reduce electricity imports from India during the dry winter season.

Under the project, electricity will be generated using water from the Kulekhani reservoir in Indrasarovar and the water will then be pumped back into the reservoir, forming a closed-loop system.

As part of the process, the NEA has called for public feedback to determine the scope for the Environmental Impact Assessment (EIA).

The authority has also begun consultations in the affected wards of the rural municipality. Ward Nos. 1, 2 and 3 of Indrasarovar are expected to be impacted by the project.

Subash Thapa Magar, Ward Chairperson of Indrasarovar-1, said discussions on the proposed project were held at the ward office in Markhu on Thursday and in Ward No. 2 on Friday. He said the consultations focused on potential impacts on settlements, infrastructure, the local economy, society and the natural environment, along with collecting suggestions for mitigation measures.

According to the NEA, the project aims to generate electricity for 6 to 10 hours daily during peak demand periods by releasing stored water from Indrasarovar into the Kulekhani stream.

The project will use the existing Indrasarovar reservoir as the upper reservoir. A new 36-metre-high dam will be constructed about three kilometres downstream, near Rangche in Ward No. 2 of Indrasarovar Rural Municipality, to create a lower reservoir with a storage capacity of 1.54 million cubic metres.

Water from Indrasarovar will be channelled through an intake structure near Kalanki in Ward No. 2 and conveyed via a 1.9-kilometre-long tunnel to a proposed powerhouse at Lippane on the left bank of the Kulekhani stream. Water released from the powerhouse will be stored in the lower reservoir.

During periods of low electricity demand, the stored water will be pumped back to the upper reservoir through the same tunnel.

The NEA said the project will not alter the storage capacity of the existing Indrasarovar reservoir. However, when operating at full capacity, the water level in Indrasarovar may fluctuate by up to 20 metres, while the lower reservoir could see fluctuations of up to 23.5 metres.

The project will install two turbines, each with a capacity of 50 MW, with a design discharge of 68.12 cubic metres per second.

The NEA has said that the EIA study will assess the project’s impacts on the area’s natural, physical, biological, social, cultural and economic systems. It has requested written feedback from local governments, schools, hospitals, health posts and other stakeholders.

Currently, the Kulekhani I, II and III hydropower projects together generate 106 MW of electricity.

By Rammani Dahal

[ 5 April 2026 / risingnepaldaily.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries