energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Kulekhani–Sisneri Pumped Storage Project Moves Forward with EIA Process in Makwanpur

The Nepal Electricity Authority has initiated the construction process for the 100 MW Kulekhani–Sisneri Pumped Storage Hydropower Project in Makwanpur district. The authority has begun work on determining the scope for the project’s Environmental Impact Assessment (EIA).

The proposed project, to be built in the Indrasarovar Rural Municipality area, will use the existing Indrasarovar as the upper reservoir. Water stored there will be released into the Kulekhani Khola to generate electricity.

According to the plan, a new 36-meter-high dam will be constructed on the Kulekhani River near Rangche, about 4 kilometers downstream of the Indrasarovar dam, to form a lower reservoir with a storage capacity of approximately 1.54 million cubic meters.

To channel water from Indrasarovar, an intake structure will be built near Kalanki in Ward No. 2. From there, water will be conveyed through a tunnel about 1.9 kilometers long to a proposed powerhouse at Litpane. After power generation, the discharged water will be collected in the lower reservoir via a tailrace.

The project will be based on pumped storage technology, under which water stored in the lower reservoir will be pumped back to the upper reservoir during periods of low electricity demand. This is expected to make energy management more flexible and efficient.

The project is designed to generate electricity for 6 to 10 hours daily during peak demand periods. Two turbines of 50 MW capacity each will be installed in the powerhouse, with a design discharge of 68.12 cubic meters per second.

According to the authority, the project will not alter the total storage capacity of Indrasarovar. However, during daily operations, the water level in the upper reservoir may fluctuate by up to 2 meters, while fluctuations in the lower reservoir could reach up to 23.5 meters.

Considered important for managing energy demand and strengthening electricity supply during peak hours, the project is expected to make the country’s energy system more balanced and reliable once completed.

Urjasanchar

[ 12 April 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries