energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Kaligandaki Reservoir Project Scaled Down to 640 MW, Nears Construction Phase

Another major project in Nepal’s energy sector has reached the stage of moving forward. Preparations for the construction of the 640-megawatt Kaligandaki reservoir-based hydropower project have been intensified.

Initially proposed at 844 megawatts, the project has been scaled down to 640 megawatts based on technical analysis following detailed studies. Currently, the work of preparing the Environmental Impact Assessment (EIA) report is in its final stage, which is expected to formally pave the way for the construction process to move ahead.

The proposed dam will be constructed around the Urleni–Khangkot area, located along the border of Gulmi and Parbat districts, about 10 kilometers upstream from the confluence of the Seti and Kaligandaki rivers. Once completed, the approximately 244-meter-high dam will create a reservoir stretching about 29 kilometers up to Khaniyaghat.

The project aims to generate around 1,645.65 gigawatt-hours of electricity annually by utilizing a net head of 183.4 meters and a water flow of 405 cubic meters per second. The powerhouse will be located at Bihadi Rural Municipality–Barrachour in Parbat, where electricity will be generated through four Francis turbines and four steel penstocks.

Upon implementation, the project will directly affect various wards of local levels in Parbat, Baglung, Gulmi, and Syangja districts. Areas such as Jaljala, Kushma, Phalewas, Bihadi, Baglung Municipality, Jaimini, Kaligandaki, and Galyang are expected to be impacted.

A joint team of international consulting companies, in coordination with the Department of Electricity Development, is carrying out the feasibility study and environmental assessment.

In terms of road access, the project site is connected to major routes such as the Prithvi Highway, Pokhara–Baglung road, and the Kaligandaki Corridor, which is expected to facilitate construction and operation.

With the goal of advancing energy production, reservoir management, and regional development simultaneously, the project is expected to become one of Nepal’s strategic hydropower projects.

Urjasanchar

[ 13 April 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries