energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Long-Term Energy Strategy Prioritizes Reservoir Hydropower and Solar Power

The government’s recently released “Energy Consumption Growth and Export Strategy, 2026/27” indicates that Nepal’s energy development priorities are now shifting toward reservoir-based hydropower projects and solar energy.

The strategy, which sets a target of generating 24,500 MW of electricity by fiscal year 2035/36, is based on long-term energy security, increasing domestic consumption, and electricity exports as its main pillars.

The policy gives special priority to reservoir-based and semi-reservoir hydropower projects. The government has concluded that reservoir projects are essential to balance the current system, where production peaks during the rainy season but declines sharply in the dry season.

Accordingly, the 1,200 MW Budhi Gandaki reservoir hydropower project has been placed under strategic priority. Long discussed, the project is being positioned as a cornerstone of national energy security. Similarly, the 670 MW Dudhkoshi reservoir hydropower project has been targeted for completion by 2034/35.

Alongside hydropower, the government plans to expand solar energy as a key part of the national energy mix. Under this plan, the Nepal Electricity Authority will develop 1,000 MW of solar projects, while the private sector will be encouraged to develop additional solar projects on a competitive basis.

The strategy also assigns a high role to the private sector in energy development. Through the Independent Power Producers’ Association of Nepal (IPPAN), the government aims to facilitate the construction of projects totaling around 14,000 MW, signaling that private developers will be major partners in future energy expansion.

Major hydropower projects such as Upper Arun, Nalgad Hydropower Project, Arun IV, and North Ganga Hydropower Project are also included in the strategy.

For the first time, the government has attempted to integrate reservoir hydropower, solar energy, and export markets into a single strategic framework. However, challenges may arise in implementation if transmission line expansion, investment assurance, and construction timelines are not effectively managed.

Urjasanchar

[ 7 May 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries