energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  NEA’s Solar PPA Framework Faces Backlash Over Application Timeline

The power purchase agreement (PPA) process initiated by the Nepal Electricity Authority for the development of solar energy projects under local government investment has come under controversy. Stakeholders have raised concerns over the transparency and fairness of the process after the pathway for company registration and share ownership was opened only as the application deadline approached.

The authority has issued a notice requiring applications to be submitted by May 11, for the development of solar projects of up to 1 MW with majority ownership by local governments. However, the Office of the Company Registrar under the Ministry of Industry, Commerce and Supplies, through a decision made on May 8, allowed local governments to register companies and acquire shares to take ownership in such companies.

This has effectively left interested parties with only two days to complete the necessary procedures. Moreover, with Sunday being a public holiday in Nepal, only one working day remains. According to stakeholders in the energy sector, it is practically impossible to complete company registration, finalize share structures, secure decisions from local governments, prepare memorandum and articles of association, obtain tax clearance, conduct feasibility studies, arrange financing, and prepare technical documents within such a short period.

This has further strengthened suspicions that the process was designed to favor only a limited group that had already completed prior preparations. According to stakeholders, although the notice was issued in the name of open competition, the implementation framework has effectively created a situation where new investors and most local governments are automatically excluded.

The authority has called for applications, stating that direct grid connection and “T-connection” facilities will be provided through the 33/11 kV system. However, complaints have been raised that the process has become extremely complicated because applicants are required, even at the application stage, to submit a company registration certificate, updated details showing at least 51 percent share ownership by local governments, records of directors, memorandum and articles of association, tax clearance certificate, electricity survey license, generation license, feasibility study report, and construction schedule.

According to energy entrepreneurs, such projects are generally implemented through a phased process. Although international practice is to request detailed technical and financial documents only after preliminary selection, the model applied here requires applicants to “complete all preparations before applying.” They argue that this approach benefits only those groups that were already financially and technically prepared in advance.

Serious questions have also been raised over the timeline. Stakeholders say that feasibility studies, financial arrangements, and legal procedures generally take months to complete, and providing only a few weeks has effectively pushed new entrants out of the process automatically.

While the provision requiring local governments to hold at least 51 percent ownership has been viewed positively, concerns have been expressed that most municipalities lack the technical capacity, financial preparedness, and fast decision-making mechanisms needed in practice. As a result, they risk becoming “nominal partners” rather than genuine lead investors.

Pricing has emerged as another major point of controversy. Energy sector experts argue that the fixed tariff rate of Rs 4.99 per unit set by the Electricity Regulatory Commission is unrealistic under current market conditions. They say the continuously rising costs of solar panels, structural materials, and transportation could make small and decentralized solar projects financially unviable under a fixed-rate model.

Stakeholders have demanded that the application period be extended by at least six months to one year, that the process be implemented in phases, and that the PPA tariff be reviewed. Otherwise, they warn that the goals of local energy self-reliance, decentralized energy development, and broader participation could end up being limited to only a small group with privileged access.

According to energy sector analysts, although the program appears positive from a policy perspective, its implementation has dragged it into controversy. They conclude that the limited timeline, complicated procedures, and the last-minute opening of company registration provisions have raised serious questions about the government’s commitment to good governance, transparency, and fair competition.

Urjasanchar

[ 10 May 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries