energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Rising Summer Power Demand Puts Pressure on Chitwan’s Electricity Distribution Network

Electricity demand has surged with the ongoing extreme heat, placing increased pressure on the power distribution system. The higher load has caused transformer failures in some areas, while aging power lines have increasingly overheated and snapped, leading to disruptions in electricity supply.

According to Rajendra Chaudhary, Chief of the Nepal Electricity Authority’s Bharatpur Distribution Centre, the unusually high demand during the hot season places excessive stress on old distribution lines, causing them to overheat and fail. He said that when multiple faults occur simultaneously, limited technical manpower often delays repair and restoration work.

Chaudhary explained that in areas with older conductor lines, wires are melting, joints are breaking, transformer fuses are blowing, and in some cases transformers themselves are failing. He noted that with limited resources and equipment, it is challenging to restore electricity service immediately in every affected location.

Electricity consumption has risen significantly as households and offices increase the use of air conditioners, fans, and other electrical appliances to cope with the heat. Demand has also grown as farmers operate electric water pumps for paddy transplantation. According to Chaudhary, electricity demand has been increasing by around 10 percent annually.

The Bharatpur Distribution Centre, which serves most areas of Bharatpur Metropolitan City and Ichchhakamana Rural Municipality, currently has approximately 75,500 customers. Around 3,000 new consumers are added to its network each year.

To manage the growing demand over the long term, Chaudhary said that additional transformers need to be installed, weak distribution lines replaced, and the distribution network upgraded. However, he noted that the capacity of the area’s power transformers has already been planned to meet electricity demand for the next 20 years.

A 90 MW power transformer has been installed at the new Aaptari Substation to provide reserve capacity, while a 112.5 MW power transformer is currently in operation at the Baseni Substation.

“We do not have a shortage of electricity. The problem lies with the distribution lines and transformers,” Chaudhary said.

He added that although the NEA has been trying to install additional transformers where needed, local-level obstructions have delayed work in some locations. Infrastructure, including poles and supporting structures, has already been completed at 14 sites, and transformers are expected to be installed there in the near future.

Jalasarokar

[ 2 Jul 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries