energyNP.com  
Tel
98510-91900¡¡
Email

Er.energyNP@Gmail.com

      ¡¡ energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Lead Acid Battery
¡¡LiFePO4 Battery
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Energy Minister Shrestha inspects power supply in western Nepal

Minister for Energy, Water Resources and Irrigation Biraj Bhakta Shrestha has reviewed the electricity supply, distribution and related problems in Banke, Bardiya, Rolpa, Dang, Pyuthan and other districts of western Nepal.

During his visit to western Nepal, Minister Shrestha visited the Nepal Electricity Authority's Lumbini Province Division Office in Nepalgunj, where he held discussions with officials and received a detailed briefing on the region's power supply and distribution system.

After hearing presentations from the division office chief, the provincial office chief and the head of the Nepalgunj Distribution Centre, the minister said that many of the area's electricity problems were caused by an ageing distribution network. He pledged to allocate the necessary budget in the coming fiscal year to upgrade and strengthen the electricity distribution system.

Shrestha said the distribution network had not received the expected level of improvement for many years, leading to growing structural and technical problems. He added that there had been no major upgrade to the distribution network under the Seventh Electrification Project since the 1990s.

He said electricity demand has been increasing by around 15 per cent every year, making it difficult for the old system to handle the growing load. According to the minister, the distribution network at the end of the Kohalpur National Grid and Tanakpur supply line challenges in the switching system, the lack of a nearby power generation centre, low voltage and delays in bringing the under-construction New Nepalgunj Substation into operation have all affected the quality of electricity supply.

The minister also said overloaded feeders, frequent power trips and ageing infrastructure have prevented the authority from providing the level of service expected by consumers.

During the discussion, Shrestha directed officials to coordinate efforts to bring the under-construction New Nepalgunj Substation into operation before next summer. He also said that additional transformers with the required capacity would be provided for Nepalgunj.

He further pledged to give priority to increasing the capacity of the distribution network, upgrading old power lines and conductors, expanding new feeders where necessary and improving load management.

On the occasion, Manoj Yadav, chief of the Nepal Electricity Authority's Lumbini Province Office, Deepak Gautam, chief of the Lumbini Province Division Office in Nepalgunj, and Sanjay Kumar Mishra, chief of the Nepalgunj Distribution Centre, briefed the minister on the current state of electricity supply and distribution and the challenges facing the region.

Local residents also drew the minister's attention to the problems they have been facing with electricity supply and distribution.

By Siraj Khan

[ 7 Jul 2026 / risingnepaldaily.com ]¡¡¡¡¡¡
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries