energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Markichok–Bharatpur 220 kV Line Begins Operation, Strengthening Power Supply from Chitwan to Kohalpur

Electricity began successfully flowing through the Markichok–Bharatpur 220 kV transmission line at 3:00 pm on Saturday, marking the completion of a long-delayed project that had been stalled for years due to construction obstacles. With the line now operational, the power transmission network from Chitwan to Hetauda, Butwal, and Kohalpur is expected to become more balanced, reliable, and efficient.

Constructed under the Marsyangdi Corridor 220 kV Transmission Line Project, the approximately 67-kilometre double-circuit transmission line connects the New Marsyangdi Substation at Markichok in Aanbukhaireni, Tanahun, to the New Bharatpur Substation at Aampatari in Bharatpur Metropolitan City, Chitwan. The project had remained incomplete for an extended period because a transmission tower in the Markichok area could not be constructed.

On June 20, Minister for Energy, Water Resources and Irrigation Biraj Bhakta Shrestha inspected the construction site and directed local representatives, the district administration, and project officials to coordinate efforts to remove the remaining obstacles. Following the completion of the tower construction, the transmission line has now been commissioned.

With the line in operation, authorities expect a significant reduction in frequent power trips and brief outages (“power flickering”) that have affected the region. The project is also expected to improve the reliability of the national transmission system and provide consumers with a more stable and higher-quality electricity supply.

Minister Shrestha said that during the monsoon season, all electricity generated by private hydropower projects along the Marsyangdi Corridor can now be transmitted smoothly to the national grid via Bharatpur. He added that hydropower plants previously forced to limit generation due to transmission constraints will now be able to operate at full capacity.

He described the project as a major achievement in integrating clean energy generated through cooperation between the government and the private sector into the national grid. According to the minister, the transmission line will further strengthen Nepal’s energy self-sufficiency and energy security.

The Markichok–Bharatpur 220 kV transmission line was built with loan assistance from European development partners and joint investment from the Government of Nepal and the Nepal Electricity Authority (NEA). With the project now in operation, electricity generated by hydropower plants along the Marsyangdi Corridor is expected to flow more efficiently into the national transmission system, making Nepal’s power network more reliable and effective.

Nepalpurbadhar

[ 11 Jul 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries