energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Hydropower plants brace for production holiday, putting 900 MW of electricity at risk

Nepal’s hydropower sector has started witnessing an undeclared power generation holiday with around 900 MW of electricity likely to go into wastage this rainy season.

The Independent Power Producers’ Association Nepal (IPPAN) has made a forecast that the private sector will be facing a loss of the aforementioned amount of electricity during the peak production season this year. Speaking at a program organised by the Hydroelectricity Investment and Development Company Limited (HIDCL) on Sunday, IPPAN President Mohan Kumar Dangi said delay in construction of transmission lines has caused heavy losses to the power producers almost every year.

As per the government records, the country’s installed hydropower capacity has reached 4,300 MW. Similarly, the hydropower plants with a capacity of 5,700 MW are under construction. “Although the sector now has investment of around Rs 68 billion, more focus has been made in power production than construction of related infrastructure for utilization,” said Dangi.

Niranjan Phuyal, chief executive officer of NRN Infrastructure and Development Limited, said the infrastructure of hydropower has been facing challenges of capital injection as the sector is mostly relying on equity investment rather than the idea of capital mix. “As a result, the hydropower companies have been witnessing a production holiday with the concerned authority asking them to cut down their electricity generation during the peak production time,” said Phuyal.

After being unable to evacuate all the produced electricity by the hydropower plants, Nepal Electricity Authority (NEA) is reported to have been giving priority to its own production plants and its subsidiary companies. The NEA is found to have asked private sector producers to produce electricity only based on their consumption.

The NEA has started instructing private sector hydropower projects to reduce production, citing the fact that transmission lines are not ready, substation capacity is not sufficient, problems in the grid and electricity supplied is in excess to demand. The NEA has been compelling mainly those hydropower projects that are in 'contingency' to reduce production as needed.

In the past few years, Nepal has transformed to energy sufficiency from an energy deficit country. The government has planned to generate a total of 28,500 MW of electricity by 2035. Out of the generated electricity, 13,500 MW has been aimed for domestic consumption, while the remaining 15,000 MW will be exported to neighboring countries.

Prajesh Bikram Thapa, chief executive officer of the HIDCL, said an investment of around Rs 7 trillion is needed to meet the government target. “For this purpose, there must be diversification in financial instruments, development of risk sharing mechanisms and proper institutional setup,” Thapa said.

[ 12 Jul 2026 / nagariknetwork.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries