energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  CARE Nepal Reaffirms BB Rating for 106 MW Jagdulla Hydropower Project

The long-term bank loan credit rating of Jagdulla Hydropower Company Limited, the developer of the 106 MW Jagdulla Peaking Run-of-River Hydropower Project under construction in Dolpa, has been reaffirmed.

CARE Ratings Nepal has reaffirmed the company’s ‘CARE-NP BB’ rating for its NPR 16.18 billion long-term banking facilities.

According to CARE Ratings Nepal, the project remains in the early stage of construction, leaving it exposed to significant execution risks. The report states that the project’s financial progress has reached around 7%, while pre-construction activities are currently underway.

The total project cost is estimated at NPR 23.595 billion, with a financing structure of 69% debt and 31% equity. Of the required NPR 16.18 billion in debt financing, only NPR 12.5 billion has been secured so far. CARE noted that financial risks remain, as the company still needs to arrange the remaining debt and raise equity through an initial public offering (IPO) for the general public and project-affected local communities.

The company aims to begin commercial operation by June 10, 2029. According to the report, a delay of more than six months beyond the scheduled date could reduce the tariff escalation benefits available under the Power Purchase Agreement (PPA), potentially affecting project revenue and returns.

CARE Ratings also highlighted hydrological risks, noting that electricity generation will fluctuate between the monsoon and dry seasons because the project is based on river flow. However, the project’s six-hour peaking reservoir is expected to partially mitigate this risk by enabling electricity sales at higher tariffs during the dry season.

The report further identified transmission infrastructure as a key risk. The project’s electricity will be evacuated through an approximately 50-kilometre, 132 kV transmission line to the Bafikot Substation, which is being constructed by the Nepal Electricity Authority (NEA). Any delay in completing the transmission infrastructure could affect project commissioning. The project also faces risks from natural disasters, including landslides and floods.

CARE Ratings stated that the company’s ownership structure supports its credit profile, as it includes the Government of Nepal and government-backed institutions. The project’s major promoters include the Vidhyut Utpadan Company Limited (VUCL), Hydropower Investment and Development Company Limited (HIDCL), the Nepal Electricity Authority (NEA), the Karnali Provincial Government, and local governments.

The company has already signed a 30-year “Take-or-Pay” Power Purchase Agreement (PPA) with the Nepal Electricity Authority. The project is expected to generate approximately 623.5 million units (kWh) of electricity annually.

CARE Ratings concluded that government incentives, including tax concessions for reservoir and semi-reservoir hydropower projects, along with policies promoting investment in Nepal’s energy sector, will provide additional support for the project’s long-term viability.

Biznessnews

[ 13 Jul 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries