energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Damauli–Bharatpur Transmission Line Moves Ahead with Forest Clearance in Chitwan

Tree felling has begun in Chitwan district for the construction of the Damauli–Bharatpur 220 kV transmission line, being developed under the Tanahun Hydropower Project. The work commenced after the project received approval to remove trees located within national and community forest areas.

The project obtained official tree-felling approval on May 9, 2026. According to Project Chief Shyamji Bhandari, tree felling, timber collection, and secure storage are being carried out under an agreement with the Division Forest Office, Chitwan.

Bhandari said the concerned Community Forest User Groups began tree felling and timber collection after completing an orientation program on safe timber handling and storage.

“We are carrying out the work in full compliance with the prescribed health, safety, and environmental standards,” Bhandari said. “Financial assistance has also been provided to the Community Forest User Groups to install fencing and CCTV systems for the secure storage and management of the harvested timber.”

A total of 1,263 trees of various species will be felled from the Satanchuli Community Forest in Bharatpur Metropolitan City–1, as well as the Akaladevi and Siddhadevi Community Forests in Ward No. 29, which lie along the transmission line corridor. In Tanahun district, the project said tree marking is currently underway.

Under a Cabinet decision of December 6, 2022, the Government of Nepal approved the use of 92.73 hectares of forest land in Chitwan and Tanahun districts and authorized the removal of 9,127 trees for the transmission line project.

Construction of Package-3 of the transmission line is being carried out by the Indian company KEC International Limited. Of the 94 transmission towers planned along the 35-kilometre transmission line, the foundations of 82 towers have been completed, while 72 towers have already been erected. Overall physical progress of the project has reached 81 percent.

Jalasarokar

[ 16 Jul 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries