energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Tunnel Blasting Begins for 128 MW Tamor-Mewa Hydropower Project

Spark Hydroelectric Company Limited has commenced tunnel excavation (tunnel blasting) works under the 128 MW Tamor–Mewa Hydroelectric Project.

According to the company, the tunnel blasting ceremony, which marks a significant milestone in the project’s construction, was held on Wednesday in Phungling, Taplejung.

With the start of tunnel blasting, underground excavation works have officially begun. The company stated that this phase is considered one of the most critical stages of the project’s construction schedule.

The company said the project has now transitioned from the planning phase to the active construction phase.

The ceremony was attended by the company’s Chairman and Managing Director, Sudip Kumar Chaudhary, along with members of the Board of Directors. The Deputy Mayor of Phungling Municipality and the chairpersons of the concerned wards attended as chief guests.

Chairman and Managing Director Chaudhary said the tunnel blasting marks not only the breaking of rock but also an important beginning toward strengthening Nepal’s energy security and building a brighter future.

He reaffirmed the company’s strong commitment to completing the Tamor–Mewa Project on schedule while maintaining high quality standards, expressing confidence that the project will provide long-term benefits to the local community as well as the nation.

According to the company’s statement, Siddhartha Bank Limited is serving as the lead bank for the project’s financial management, while Machhapuchchhre Bank Limited is participating as the co-lead bank.

The company said the collaboration and loan investment from both banks have played a crucial role in securing the financial resources required for the project.

Upon completion, the 128 MW project will be connected to the national transmission system.

The project is expected to increase electricity supply, reduce energy shortages, and contribute to the country’s economic development through renewable energy.

The company stated that construction will be carried out on schedule while ensuring compliance with safety standards and giving high priority to environmental considerations.

kantipur

[ 6 Aug 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries