energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  828 MW Uttarganga Project Enters Construction Phase After Generation Licence

The 828 MW Uttarganga Reservoir Hydropower Project, which has remained stalled for years amid studies, disputes and procedural complexities, is set to move forward with construction after receiving its generation licence. The Department of Electricity Development granted the generation licence for the project to Uttarganga Power Company Limited, a subsidiary of the Nepal Electricity Authority, on August 5.

The Uttarganga project has been under discussion since 2004 but could not move ahead for a long time due to disputes over water utilization and the project’s infrastructure. There had been disagreement over whether the water of the Uttarganga River should be diverted toward the Bheri River or toward the Nisikhola River. With the latest decision, the project’s structure for diverting the water toward Nisikhola for power generation has been formally finalized.

According to Badri Kuikel, information officer at the Department of Electricity Development, the 828 MW project has been granted its generation licence. The government is preparing to initiate the tendering process for construction of the project within the current fiscal year. With the generation licence providing the necessary procedural basis for construction, financial closure and the contracting process are now expected to gain momentum.

The project’s detailed project report has been prepared with plans to collect water from the Uttarganga River in the Dhorpatan Valley of Dhorpatan Municipality, Baglung, and divert it into the Nisikhola River for power generation.

Under the project, a high dam will be constructed on the Uttarganga River to create a reservoir. Water stored in the reservoir will be diverted toward Nisikhola through a 6.51-kilometer-long main tunnel and used to generate electricity.

The project’s Environmental Impact Assessment report has already been approved. The EIA report approved on January 16, 2024, also adopted the structure of diverting water from the Uttarganga River toward Nisikhola for power generation. The department has also informed Dhorpatan Municipality and Nisikhola Rural Municipality, where the project is located, about the issuance of the generation licence.

As the Uttarganga project is both a reservoir and inter-basin water transfer project, it is regarded as strategically important for Nepal’s electricity system.

Reservoir projects can play an important role in reducing dependence on electricity generation only during the monsoon, when river flows are high, and enabling relatively stable power generation during the dry winter months. For this reason, the government has continued to prioritize Uttarganga as one of Nepal’s important and relatively low-cost reservoir hydropower projects.

Nepal faces a seasonal imbalance in electricity generation, with output increasing during the monsoon but declining in winter as river flows fall. In such circumstances, projects like Uttarganga, which can store water in a reservoir and generate electricity according to demand, are expected to help maintain seasonal balance in the power system. Electricity generated by the project could help manage domestic demand while also strengthening the basis for future power exports.

The government is preparing to complete financial arrangements and advance construction and contracting processes for major hydropower projects, including Uttarganga, within the current fiscal year. Along with the 828 MW Uttarganga project, the government plans to move the 1,061 MW Upper Arun, 210 MW Chainpur Seti, 99 MW Tamakoshi-5 and 77 MW Ghunsakhola projects into the construction process.

With the issuance of the generation licence, a major procedural obstacle to the construction of the Uttarganga project, which has been under discussion for nearly two decades, has been removed.

The project’s actual progress will now depend on financial closure, the tendering process and the timeline for entering the construction phase.

As the government plans to initiate the tendering process within the current fiscal year, Uttarganga is now expected to move from the stages of study and dispute into the construction phase.

Biznessnews

[ 12 Aug 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries