energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Dandakhet–Rahughat 132 kV Transmission Line Nears Completion

The under-construction 132 kV Dandakhet-Rahughat transmission line project in Myagdi has achieved 89 percent physical progress as the deadline of its third extension is about to expire.

A contract worth Rs. 3.57 billion was signed with Larsen & Toubro Limited on December 31, 2021, for the construction of the 25-kilometer transmission line connecting Dandakhet in Malika Rural Municipality-7 with Ambang in Raghuganga Rural Municipality-3, along with substations at both locations.

After the first deadline expired on July 16, 2025, and the second on November 16, the deadline was extended for a third time until August 16, 2026.

Suraj Gurung, an engineer and assistant project manager, said the contractor does not appear likely to complete the work even within the third extended deadline.

“Although the project has been repeatedly urging the contractor to speed up the work and has been coordinating and facilitating with stakeholders, it appears that another four to five months will be required,” he said. “The delay has been caused by the failure to obtain tree-felling approval in forest areas falling within the transmission line’s right-of-way, the weak geology at the Rahughat substation site, disaster risks, and disputes with local residents at some tower construction sites.”

The Nepal Electricity Authority is constructing the transmission line to connect electricity generated by hydropower projects in the Myagdi and Rahughat basins to the national grid. Of the 82 towers planned for the 132 kV double-circuit transmission line, foundations for 80 have been completed and 72 towers have been erected so far. Equipment for both the transmission line and substations has already been imported.

The Dandakhet substation has reached 90 percent completion, while stringing of conductors has been completed along 12.1 kilometers of the 25-kilometer transmission line. Project chief Roshan Agrawal said construction of the physical structures at the Dandakhet substation has been completed and testing is currently underway.

The Dandakhet substation, constructed on a total area of 51 ropanis, is being equipped with 133/33 kV, 30 MVA capacity equipment using AIS technology. At the Rahughat substation, which will use GIS technology and be equipped with 220/132/33 kV, 200 MVA capacity equipment, installation of equipment and construction of the office building have reached the final stage.

The total estimated cost of the project is Rs. 4.88 billion, of which Rs. 1.05 billion is being financed by the Nepal Electricity Authority and Rs. 3.82 billion through a loan from the Asian Development Bank (ADB). The loan agreement with the ADB, originally worth US$27 million, was later increased to US$31 million. The ADB is financing the Rahughat-Dandakhet transmission line through its Electricity Transmission Line Modernization Project.

For the use of 25.62 hectares of community and national forest land required for the transmission line right-of-way and tower sites, the Council of Ministers granted approval on February 18, 2024. However, the Division Forest Office issued the tree-felling order only in the first week of June this year - two years and two months after the Cabinet approval.

There are 3,936 trees within the project construction area. Of the 82 transmission towers, 40 are located in forest areas and 42 on private land. In compensation for using forest land, the project purchased 504 ropanis of land in October 2024 and has already provided the first installment of funds for planting and raising seedlings.

Four hydropower projects with a combined capacity of 172.8 MW are under construction along the Myagdi River. In the Rahughat area, the 35.5 MW Chimkhola-Rahughat-Mangle, 48 MW Upper Rahughat, 21.3 MW Thulokhola, and 23.5 MW Upper Thulokhola hydropower projects have started generating electricity. The 40 MW Rahughat Hydropower Project is in the final stage of construction.

The Chimkhola-Rahughat-Mangle project developed by Tundi Power and the Thulokhola Hydropower Project developed by Samyukta Urja have supplied electricity to the 220 kV Kaligandaki transmission line using temporary towers.

Spotlight

[ 12 Aug 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries