energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  NEA Forms Five-Member Committee to Prepare for Winter Power Demand Management

Nepal Electricity Authority (NEA) has begun necessary preparations to manage the anticipated rise in electricity demand in the Kathmandu Valley and other areas during the upcoming dry season (winter). The decision to intensify related studies and work came at a meeting held at the Authority on Tuesday regarding winter power demand and supply management.

The preparations come after power generation was halted at hydropower stations operating along the Bhotekoshi–Trishuli river corridor in Rasuwa district, following the recent devastating flood that damaged those facilities, prompting the need for advance planning to manage electricity demand and supply this winter.

Committee formed

The meeting, chaired by NEA Managing Director Dirghayu Kumar Shrestha, was attended by deputy executive directors of the Project Management Directorate and the Transmission Directorate, along with heads of various departments and project chiefs.

To advance the necessary studies and work for winter demand management, the meeting formed a five-member committee coordinated by the Director of the Bagmati Provincial Office. The committee has been instructed to submit daily progress reports to the Executive Director and to immediately report any problems encountered during implementation.

No loadshedding expected

Managing Director Shrestha clarified at the meeting that although the halt in production from power stations in the Trishuli river basin has created some pressure on demand and supply management, there will be no loadshedding this winter and no such situation is expected to arise. He said preparations for managing power supply were already being advanced. The meeting also set deadlines for completing ongoing transmission and distribution projects under construction in the Kathmandu Valley and surrounding areas.

Restoring supply to flood-hit areas

The meeting further decided to discuss various options and proceed with the necessary process to make power supply more reliable in flood-affected Nuwakot and Rasuwa districts. A team has also been mobilised to conduct an on-site study on the possibility of bringing the flood-damaged Devighat substation back into operation.

[ 23 September 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries