energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Minister Shrestha Directs NEA to Prioritize Transmission and Distribution Improvements

Minister for Energy, Water Resources and Irrigation Biraj Bhakta Shrestha has directed the Nepal Electricity Authority (NEA) to move forward in a results-oriented manner and make electricity services more reliable, quality-driven and customer-focused.

Administering the oath of office and secrecy to newly appointed NEA Managing Director Dirghayu Kumar Shrestha on Wednesday, Minister Shrestha said state agencies are servants of the people and must work responsibly by giving the highest priority to service delivery.

Minister Shrestha directed the NEA to pay special attention to making the electricity system, which was disrupted by flooding in the Trishuli River and has since been restored, sustainable and reliable. He said the authority should regularly analyze and project electricity demand and supply to ensure that all customers, including domestic and industrial consumers, have access to quality and reliable electricity 24 hours a day, seven days a week, throughout the year.

Emphasizing the transparent, economical, efficient and optimal use of available resources, equipment and human resources during difficult circumstances, Minister Shrestha instructed the NEA to make institutional governance and customer satisfaction key indicators of its performance.

He also directed the authority to give high priority to the construction of transmission lines and improvement of the distribution system, accelerate strategically important projects, and take the lead in rebuilding power projects damaged by disasters.

Minister Shrestha said effective coordination among the ministry, the NEA and other concerned agencies was necessary to further strengthen state institutions and make them more accountable and results-oriented.

Newly appointed Managing Director Shrestha, who has been working responsibly from the grassroots to the leadership level of the NEA in responding to challenges in the energy sector caused by recent disasters, expressed confidence that he would continue working with the same commitment in the days ahead.

At the program, Acting Secretary of the ministry Dr. Jagadish Karmacharya congratulated Managing Director Shrestha on his appointment and said the government had entrusted him with the responsibility based on his expertise and qualifications. Expressing confidence that the NEA would achieve greater results under his leadership, Acting Secretary Karmacharya emphasized that the new leadership must address all challenges and move the institution forward amid the loss of lives and property and the difficulties caused by recent disasters.

Urjasanchar

[ 24 September 2026 / nepalenergyforum.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¨l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries