energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Rahughat Hydropower Project connected to national power transmission grid

The 40-megawatt Rahughat Hydropower Project has been connected to the national transmission system.

Raghuganga Hydropower Limited, a subsidiary of the Nepal Electricity Authority (NEA), built the project in Raghuganga Rural Municipality, Myagdi. The project¨s two 20-megawatt units have started generating electricity and have been connected to the national transmission system since Wednesday.

The electricity generated by the project has been fed into the national transmission grid through the Kaligandaki Corridor 220 kV transmission line.

According to the electricity purchase and sale agreement between the project and the NEA, trial production will now be carried out. After 15 days of testing, commercial electricity production is expected to begin.

NEA Executive Director and Chairman of the Board of Directors of Raghuganga Hydropower Limited, Dirghayu Kumar Shrestha, said that the project was completed through continuous efforts despite challenges such as difficult geographical conditions, the COVID-19 pandemic and floods.

He said that since the project can operate at full capacity for four hours daily during the evening, when electricity demand is high, it will make an important contribution to managing electricity demand during the dry season.

The project will generate 247.9 million units of electricity annually. About 34 percent of its total annual energy generation will be produced during the dry season.

The estimated cost of the project, excluding interest during the construction period, is Rs 9.17 billion. The project is financed through investments from the Government of Nepal and the Nepal Electricity Authority, along with a concessional loan obtained under a line of credit from India's Exim Bank.

Indian civil contractor company Jaiprakash Associates (JP) signed a contract worth Rs 6 billion for the project. The initial agreement was signed on November 17, 2017, with a 45-month completion target. However, the project timeline was extended for the first time in February 2022 and again in June 2024.

As the construction could not be completed within the revised deadlines, the deadline was extended for a third time in July 2025, with completion targeted for November 27, 2025.

The deadline has now been extended for a fourth time, with the project nearing completion.

[ 25 September 2026 / nagariknetwork.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¨l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries