energyNP.com  
Tel
98510-91900 
Email

Er.energyNP@Gmail.com

        energyNP@hotmail.com
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Lead Acid Battery
 LiFePO4 Battery
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Floods cause estimated Rs 74 billion damage to power infrastructure

Floods triggered by the Bhote Koshi River on August 26 have caused an estimated Rs 74 billion in preliminary damage to Nepal’s power generation, transmission and distribution infrastructure, according to the Nepal Electricity Authority (NEA).

The floods cut 430 MW of electricity from the national system and damaged the 220 kV hub of the Upper Trishuli-III ‘B’ project, along with infrastructure at several other hydropower projects.

NEA Executive Director Dirghayu Shrestha said the preliminary damage to the infrastructure of the NEA and its subsidiaries is estimated at around Rs 74 billion.

Continuous rainfall has also damaged power infrastructure and forced several power plants to shut down unexpectedly.

Although power supply has been restored in most affected areas through efforts by distribution centers and the Grid Operation Department, some generation plants may take time to resume operations. The NEA has deployed technical teams to restore electricity lines in the remaining affected areas.

Eight power projects with a combined capacity of 230 MW remain offline. Meanwhile, hydropower projects with a combined capacity of 262 MW in the Seti-Madi corridor and 190 MW in the Marsyangdi corridor have resumed operations after floods disrupted them.

The 144 MW Kaligandaki Hydropower Project, which was also forced to shut down by the floods, is expected to resume operations by this evening, the NEA said.

The authority said it has yet to determine the full extent of the damage because blocked access routes have prevented technical teams from conducting on-site inspections at several damaged locations.

Rainfall disrupted electricity supply in several areas, including Manang, Baglung, Mustang, the Jhaputar substation area of Tanahun and Pyuthan.

The NEA has already restored power in Myagdi, the Kutar substation area of Tanahun, Baglung and Eastern Rukum. Technical teams have been mobilized to restore electricity in the remaining affected areas by Tuesday.

The NEA estimates that domestic power generation will provide around 1,218 MW during the upcoming dry season. To meet demand, it plans to import an additional 1,154 MW of electricity from India through various channels.

[ 28 September 2026 / nagariknetwork.com ]   
 

Infrared Cooktop | Infrared Cooker | Infra red Cooking Range | Electric Cooktop | Electric Cooker | Nepal | Kathmandu | Induction Cooktop | Induction cooker | energyNP.com | Pottery Furnace Dual Infrared Cooker Double Panels Infrared Cooktop Inteligent Touch Electric Ceramic

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries