energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  884MW Suki Kinari Hydropower Project to Start Power Generation by November

Suki Kinari hydropower project (884-megawatt), a China Pakistan Eco-nomic Corridor (CPEC) portfolio proj-ect, which will be completed at the cost of $2 billion, will start power gen-eration by November 2024. This was stated by Shah Jahan Mirza, Managing Director Private Power Infrastructure Board (PPIB), here while speaking at workshop aimed at developing a robust mechanism for tariff-based bidding of hydropower projects in Pakistan. The workshop was organized by PPIB in col-laboration with the Agence Francaise de Developpement (AFD), France.

One of the key highlights of the event was sharing draft generic Request for Proposals (RFP) documents for hydro-power IPPs prepared by Joint Venture – Tractebel GmbH, Germany and NDC (the ‘consultant’) in line with international best practices and applicable local regu-lations. The event brought together key stakeholders, including government of-ficials, industry experts, investors, local and international banks, and representa-tives from the energy sector, to deliberate on the critical aspects of tariff-based bid-ding and its significance in the develop-ment of hydropower projects in Pakistan.

Shah Jahan Mirza remarked that PPIB has already accomplished significant success towards attracting private in-vestment in establishing hydropower IPPs which is evident from the fact that so far 4 hydro IPPs of over 1,000 MW have been completed while another 13 hydro IPPs of 5,455 MW are at different stages of processing out of which 884 MW Suki Kinari project is scheduled to be in op-eration by November 2024. Suki Kinari is being constructed on River Kunhar locat-ed in Khyber Pakhtunkhwa province. The project is being executed by Suki Kinari Hydro (Pvt) Ltd / China Gezhouba Group Company Ltd in IPP mode.

Besides, hydropower, PPIB’s efficient facilitation has resulted in successful implementation of 54 wind/solar/ba-gasse based IPPs of 2,785 MW, he add-ed. As Pakistan continues its journey towards attaining energy security, sus-tainability, efficiency and competitive-ness, initiatives such as this workshop play a pivotal role in shaping the future of the country’s energy landscape.

Mirza commended the consultant for its dedication and expertise in crafting a robust framework and remarked that this is a major step for moving towards award of projects through competitive bidding instead of present system. Other esteemed speakers delved into the intri-cacies of the RFP, highlighted its key fea-tures and potential to streamline the bid-ding process for hydropower projects.

The workshop served as a platform for fostering dialogue, exchanging ideas, and building consensus on the way for-ward for accelerating the development of hydropower projects in Pakistan for lowering generation cost. Participants expressed their commitment to work-ing collaboratively towards achieving the shared goal of ensuring a sustain-able, reliable, less expensive and eco-friendly energy supply for the nation.

by nation

[8 March, 2024 / world-energy.org ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries