energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Nepal requests WB to expedite financial management of 1,063 MW Upper Arun Hydroelectric Project

Nepal has requested the World Bank (WB) to take forward the financial management of the Upper Arun Hydroelectric Project citing the delay in the construction of the project which was supposed to start in April.

In a meeting with the WB’s representatives on Tuesday, Energy Minister Deepak Khadka requested the international lending institution to conclude the financial closure as soon as possible. According to the Ministry of Energy, Water Resources and Irrigation, the WB has expressed its keenness to finalize the financial management provided the government comes up with its commitment to solve the issues that might emerge during the project construction.

The government has sought the WB’s initiatives in line at a time the 1,063.36 MW project has witnessed a delay in its construction. While the government has planned to build the project, Indian Company Sutlej Jalvidyut Nigam has been putting pressure at the political and diplomatic level to grab the contract for the mega hydropower project proposed to be built in Bhot-khola Rural Municipality of Sankhuwasabha.

Nepal Electricity Authority (NEA) through a subsidiary company ‘Upper Arun Hydro-Electric Limited has started a study on various aspects of the project. On the other hand, the Indian company is insisting on getting the contract for all the projects based in the Arun basin including 900 MW Arun III project and 210-km long transmission line in the region.

Earlier, India had urged the WB to reconsider its involvement in the project due to ongoing Indian-led projects downstream of the Arun River. In response, the WB in the last week of October replied to India stating that no loan agreement has been finalized, and the project is still under review.

Upper Arun is a game changer project of Nepal which is expected to operate at full capacity for six hours a day during the six months of winter when there is a high demand for electricity. The project that will produce around 4.53 billion units of electricity annually is estimated to cost US $2.24 billion.

On April 12, the government and the WB agreed to expedite the project construction work as soon as possible. To this end, Upper Arun Hydro-Electric Limited has been working to start construction of the project from the beginning of 2026.

[ 13 November, 2024 / nagariknetwork.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries