energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  ADB to support reconstruction of Kavre Integrated Water Supply Project

The Asian Development Bank (ADB) is to assist in the reconstruction of the Kavre Valley Integrated Water Supply Scheme (KVIWSS) after it was damaged during floods and landslides triggered by incessant rains on September 27 and 28.

The scheme is under construction for improving the water supply to three old cities in the district – Banepa, Panuti and Dhulikhel.

The ADB's commitment for support to the water supply scheme was finalized following a discussion on Monday between ADB officials including its Country Director for Nepal, Arnaud Cauchois and a team from the KVIWSS comprising its Board Chairman and Dhulikhel Municipality Mayor, Ashok Byanju.

The floods and landslides had devastated the water supply project which had reached the final phase of completion. Mayor Byanju said after the meeting with ADB officials that ADB has expressed its commitment for assistance for the reconstruction of the water supply scheme.

According to him, ADB has pledged to prepare the detailed project report and to provide financial assistance for the reconstruction of the project.

Mayor Byanju said the natural disaster damaged the water supply infrastructure including the project's in-take, water tank and the distribution mains and branch pipes. The damage was worth Rs 218 million.

KVIWSS was launched in 2012 to solve the drinking water supply-related problems in Dhulikhel, Banepa and Panauti towns.

It is projected that 140 thousand people of the three towns would benefit from the project due for completion in 2024, with 24-hours water supply in taps at their homes.

The project cost is Rs 990 million 807 thousand, without adding VAT.

[ 26 November, 2024 / nagariknetwork.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries