energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Petroleum exploration in Dailekh in final stage

Drilling work under the exploration of petroleum products in the Bhairavi Rural Municipality-1 Jalajle area of Dailekh, is in the final stage.

Geologist of the Petroleum Project Division under the Department of Mines and Geology Prakash Luitel said that 3,660 meters of drilling have been completed, and a total of 4,000 meters are to be drilled.

The work was started last May so that the drilling work could be completed within four months. However, due to hard rock the drilling lengthened resulting in an extension of drilling time to be completed till December.

He said, “We are collecting the details obtained from the stone and soil test done by the experts from every 2/2 meter depth of the deep drilling. Study on source rock, reserve wire rock, and seal rock will be added after finishing the drilling up to 2,700 meters.”

The signals under the necessary standards set to be petroleum products are being successfully received.

For drilling, 45 ropani land has been acquired in Bhairavi rural municipality-1 Jaljale of Dailekh.

Currently, a group of 80 Chinese and Nepali people is doing drilling work. On February 28, 2019, an agreement was reached with the Chinese government to explore petroleum products within three years at Shirasthan Navisthan Paduka in Dailekh.

Petroleum products are being explored with a subsidy of 2 billion 500 million rupees from the Chinese government. Petroleum products will be discovered only after drilling to a depth of 4,000 meters.

Under the first phase of petroleum exploration and extraction, the Chinese technical team completed four surveys under the first phase, including a seismic survey, geological survey, magneto-telluric survey, and geochemical sampling survey.

Source: Rising Nepal

[ 17 December, 2024 / nepalenergyforum.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries