energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Upper Tamakoshi to be fully operational by the first week of January

After the repair of the desander on the left side which was damaged by the landslide, water will be filled, electricity will be generated by sending water according to the flow of Tamakoshi, the goal of generating 456 megawatts of electricity in the peak hour.

The repair of the country’s largest 456 MW Upper Tamakoshi hydropower station, which was damaged by the landslide on September 28, has been accelerated. Preparations have been started to start production from the power plant by keeping the deadline of December 25.

However, it is expected to take at least another month, or until the first week of (mid-January), to fully repair and bring the center into complete operation, according to Mohan Gautam, the Chief Executive Officer of the Tamakoshi Hydropower Center.

The repair of two desander ponds at the power plant is in its final stages. Among them, preparations are underway to produce electricity by directly channeling water from the dam site as soon as the repair of the left-side desander is completed.

Since the repair of the left-side desander is nearing completion, electricity production will begin by directly channeling Tamakoshi’s water on December 25, according to Purnagopal Ranjit, the manager of the power plant, speaking to Kantipur. The landslide had caused extensive damage to the power plant, including the desander and Tower No. 46 of the transmission line. While the construction of the tower has been completed, Ranjit stated that water will be filled once the repair of the damaged left-side desander is finalized.

Source: Kantipur

[ 20 December, 2024 / nepalenergyforum.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
GREE Air Conditioner Residential Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries