energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Industries no longer required to conduct EIA and IEE for capital increase

Industries will no longer be required to conduct Environmental Impact Assessment (EIA) and Initial Environmental Examination (IEE) in order to increase capital. Previously, under the existing Industrial Enterprises Act, 2076 (2020), any industry had to mandatorily carry out EIA and IEE when raising capital.

Since the EIA and IE are done before an industry comes into operation, the private sector had been suggesting to the government to remove this provision for a long time stating that the obligation to repeat these assessments during capital expansion has been seen as an additional cumbersome process.

An ordinance introduced by the government to amend certain Nepal laws related to improving the economic and business environment and enhancing investment has made such provisions at a time when many industries, despite their desire, are reluctant to increase capital due to the additional burden of EIA and IEE requirements.

By amending this act, the government has also included a provision that if the government has to transfer from one province to another, the approval of the Department of Industry is not required.

The Industrial Business Act mentioned that EIA and IEE are required in case of capital increase, capacity increase, purpose addition, change, relocation or relocation of the industry.

The EIA and IEE typically take between six months to one year. The private sector has been advocating for the removal of the mandatory requirement to conduct EIA and IEE repeatedly for capital increase, arguing that it causes delays and prevents the initiation of other projects, leading to various issues.

[ 15 January, 2025 / nagariknetwork.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries