energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy
 
  Raghuganga folks put forth 31-point demand before hydropower projects

Locals of Raghuganga Rural Municipality in Myagdi district have put forth a 31-point demand before five hydropower projects that are under construction within the rural municipality.

The Raghuganga folks collectively prepared the 31-point demand after holding extensive discussion among local political parties, stakeholders and people's representatives after the projects did not fulfill the minimum responsibilities.

The Rural Municipality Chairman Bhava Bahadur Bhandari shared that they, on Sunday, organized an all-side meeting at the rural municipality and prepared the demands after the projects did not make public the details of amount allocated under the social responsibility heading and other expenses.

He added that the municipality has sent a letter to the chiefs of the hydropower projects asking them to attend the extensive discussion related to hydropower to be organized by the Rural Municipality on March 14.

A 40-megawatt Rahughat, 22.5 megawatt Thulokhola 'A', 35.5 megawatt Rahughat Mangale, 21.3 megawatt Thulokhola and 48.5 megawatt Upper Rahughat hydropower projects are under construction in the rural municipality.

The locals and people's representatives protested after the projects started spending budget unilaterally though the environmental impact assessment report mentioned that there would be adverse impact on physical, chemical, biodegradable, economic, social, religious and cultural environment within the rural municipality due to hydropower projects and certain amount of budget must be allocated to minimize the impacts.

Though the hydropower projects last year made an agreement to gravel and upgrade the road from rural municipality to project sites, they have not started any activity in this regard so far, shared the rural municipality.

Among the demands made by the rural municipality include blacktopping of the approach roads constructed by the projects, making public the project's total cost estimate budget and spending the amount allocated under the corporate social responsibility as per the decision of the Ward and Rural Municipality Executive.

It is stated that although the rural municipality has urged the projects to submit their Detailed Project Report and the EIA report to it, none of the projects has done so far.

Similarly, among other demands are the hydropower companies should ensure 10 per cent share of their total cost to the locals of the project-affected area, immediately providing the compensation for the houses damaged at the project construction site, construction of alternative drinking water and irrigation facilities as the natural sources of water have dried up after the construction of the project tunnel, compensating for the damage caused by the project to the forests and providing appropriate compensation amount to the rural municipality for mitigating the damage caused by the environmental pollution.

The locals are irate after lack of transparency of the amount to be spent on the community's education, health, water supply, among other community services as demanded by the residents of the project-affected areas.

The people's representatives and stakeholders have exerted pressure calling for transparency of the amount to be spent for the community.

[ 11 March, 2025 / nagariknetwork.com ]   
 
 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Electric Folded Treadmill Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries