energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  NHPC Commissions Three Units of Parbati-II Hydroelectric Project

NHPC Limited, an Indian public sector company, has commenced commercial operations for three of the four 200MW units of its 800MW Parbati-II hydroelectric project in Himachal Pradesh’s Kullu district. Operations began at midnight on April 1, 2025, with the fourth unit expected to start soon.

R.K. Chaudhary, NHPC Chairman and Managing Director, announced: “It gives me immense pleasure to announce that 3 units of 200 MW each of NHPC’s ambitious 800MW Parbati-II Hydroelectric Project, located in Himachal Pradesh, have been successfully commissioned during March 2025 and commercial operation has commenced today on 1st April, 2025. The Parbati-II Project is one of our most ambitious projects which had overcome numerous challenges and obstacles during its construction and this achievement stands as a testament to the hard work, dedication and teamwork of our committed employees.”

Located on the Parbati River, the run-of-the-river project features an 83.7m-high dam near Pulga in the Manikaran Valley, diverting water through a 31.56km head race tunnel—India’s longest—to a powerhouse in the Sainj Valley. Equipped with four 200MW Pelton turbines and two 1,545.5m-long inclined pressure shafts, the project utilizes an 862.5m gross head. Additional water from five streams enhances power generation.

Construction, initiated in 2002 after a 1999 foundation ceremony, faced challenges like cloudbursts, floods, and geological issues. Costing Rs. 13,045 crore, the project is designed to generate 3,074 million units annually and boost the 520MW Parbati-III station’s output by 1,262 million units yearly. Since 2018, part-load generation from Jiwa Nallah produced 1,130 million units, yielding Rs. 182 crore.

Himachal Pradesh receives 12% of the power free, plus 1% for local development. NHPC invested Rs. 112 crore in local infrastructure, including 15 bridges and 88km of roads, and Rs. 27.83 crore in CSR initiatives for health, education, and welfare. The project employs 20 locals permanently and 349 indirectly, with 98% being residents. During construction, 1,171 of 1,361 workers were from Himachal Pradesh. Livelihood support reached 370 families, and 58 vehicles were hired from affected households.

NHPC funds a Kendriya Vidyalaya in Sainj, educating 422 students, mostly local, at Rs. 4 crore annually, and contributed Rs. 4 crore to Kullu’s Regional Hospital. With a 7,833MW installed capacity, NHPC advances renewable energy, marking Parbati-II’s commissioning as a milestone in its 50th year.

by water power

[ 17 April, 2025 / world-energy.org ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries