energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Upper Thulokhola Hydropower Project Nears Completion: Final Stage of Construction

The 22.5-megawatt Upper Thulokhola Hydropower Project, located in Raghuganga Rural Municipality-7 of Myagdi, has reached its final stage of construction.

The project, promoted by Thulokhola Hydropower Limited and initiated three years ago, has achieved 90 percent physical progress. Project chief Lok Bahadur Nayak stated that the dam, powerhouse, and pipeline installations have been completed, and the equipment installation at the powerhouse and the construction of the transmission line are in their final stages.

“The schedule to start test production by Baisakh 2082 (April-May 2025) has been affected due to the disruption caused by the upgrading of the road connecting Beni to the project site,” he said. “The delay in equipment installation occurred because transportation was halted, as the powerhouse is located in a geographically remote area.”

From Fedhi to Bandi, 14 towers are being constructed for a 5-kilometer-long, 132 kV transmission line, which is currently under construction. From Bandi, the electricity from the project will be integrated into the national grid through collaboration with the Thulokhola and Chimkhola-Mangale-Rahughat hydropower projects, using the 220 kV Dana-Khurkot transmission line via Tilkenichaur.A dam, desander (a settling basin for water), a 2,900-meter main pipeline, and a 300-meter surge shaft pipeline have been installed at Sugurthala, while the powerhouse has been constructed at the base (Fedhi). Construction of the switchyard has also begun within the powerhouse premises.

Dev Urja Construction is the contractor for civil and hydromechanical works, while BFL Bangalore is responsible for the electromechanical components. The project, estimated to cost 3 billion rupees, is being financed with 70 percent debt investment from Citizens Bank and Machhapuchchhre Bank. Of the remaining investment, 10 percent will come from the promoter, and 20 percent will be raised by issuing shares to the general public.

[ 3 May, 2025 / nepalenergyforum.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries