energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Govt close to finalizing modality to fund 10,800 MW Karnali-Chisapani Multipurpose Project

The government is moving forward with plans to construct the 10,800 MW Karnali-Chisapani Multipurpose Project (KCMP) under a financing modality that will involve investments from Nepal, India, Bhutan, Bangladesh, and Sri Lanka.

According to the Ministry of Energy, Water Resources and Irrigation, a new financing model is being developed to allow for joint investment by multiple stakeholders in the mega project. Energy Minister Dipak Khadka stated that this transformative cross-border collaboration will enhance regional energy security while also improving irrigation capacity, enabling inland water transport, and promoting environmental sustainability.

Minister Khadka said five South Asian countries are coming together to invest in the Rs 2,000 billion project. “This landmark initiative will fuel national prosperity and usher in a new era of sustainable growth and shared economic progress,” he wrote on social media platform X.

The game-changing project has been under discussion for over six decades. However, Nepal has faced significant challenges in executing a project of this scale due to limited domestic resources and technical expertise. In recent years, the Nepal Electricity Authority (NEA) has accelerated its study of the KCMP, which is poised to become the largest hydropower project in South Asia.

A study conducted in 1989 found that the project would affect a total of 11,570 hectares of land and impact around 54,600 residents in the districts of Bardiya, Kailali, Surkhet, Achham, and Doti. The reservoir of the proposed project would be located approximately two kilometres upstream of the Karnali-Chisapani Bridge, which connects Bardiya and Kailali.

As part of the project, a 270-metre-high dam would be constructed on the Karnali River. The reservoir is expected to stretch 167 kilometres in total—100 kilometres on the Karnali River, 45 kilometres on the Bheri River, 16 kilometres on the Seti River, and six kilometres on the Thuligad River.

The project also includes the construction of an underground powerhouse on the bank of the Karnali River. A 1,200-metre-long tunnel will be built to channel water to the powerhouse. Additionally, a 765 kV transmission line will be installed to evacuate electricity generated by the project.

According to a preliminary study, the KCMP is expected to take nine years to complete. The cost of electricity generation is estimated at Rs 106.2 million per megawatt—almost half the current cost of over Rs 200 million per megawatt. Besides electricity generation, the project is projected to irrigate 191,000 hectares of land in Nepal and 320,000 hectares in India.

If realized, this multipurpose project will help Nepal meet its goal of transitioning to green energy while also supporting cross-border electricity trade. Nepal has committed to achieving net-zero carbon emissions by 2045. Following the signing of a long-term power trade agreement with India, the country aims to export 10,000 MW of electricity to its southern neighbor over the next decade.

[ 6 May, 2025 / nagariknetwork.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries