energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Japan commits $18.5 million to rebuild flood-damaged BP Highway in Nepal

Japan has pledged 2.8 billion Japanese Yen (approximately NPR 2.63 billion or $18.5 million) in grant aid to reconstruct a section of Nepal’s BP Highway, devastated by floods seven months ago. The commitment follows a formal request from Nepal, with Japan’s embassy submitting a diplomatic note and draft exchange of notes to the Ministry of Finance, outlining the aid for rebuilding the flood-ravaged highway.

The funds, earmarked for a 3.2-kilometer stretch from Dalabesi to Barkhekhola, will be disbursed after Japan’s next fiscal budget cycle (April 2026 to March 2027), as confirmed by a Finance Ministry source. The Japan International Cooperation Agency (JICA) is currently conducting an ongoing assessment of the damaged highway, with its team still in the field.

The floods, triggered by heavy rainfall on October 11-12, 2024, washed away 8.5 kilometers of the highway, with a 12-kilometer section severely impacted. In response, then-Prime Minister KP Sharma Oli had urged Japanese Ambassador Yutaka Kikuta in late October 2024 to support reconstruction efforts.

Nepal’s Department of Roads has divided the reconstruction into four sections - three in Kavre and one in Sindhuli - with Japan assigned one section. The remaining three sections, covering Nepal-thok to Barkhekhola (5 km), Dalabesi to Charasyabesi (8.5 km), and Charasyabesi to Bhakundebesi (11 km), are under technical evaluation for contractor bids.

The government has allocated NPR 8.5 billion ($60 million) for these sections, with 11 companies bidding for the Nepal-thok and Dalabesi packages and eight for the Bhakundebesi package.

The reconstructed highway will feature a two-lane design, with contracts targeting completion within two years. Technical evaluations of bids are ongoing, and financial proposals will be opened soon.

[ 7 May, 2025 / fiscalnepal.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries