energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Energy Sector Faces Crisis After Budget Declaration, Warns IPPAN

The budget for the fiscal year 2082/83 (2025/26) states that the Power Purchase Agreement (PPA) for run-of-river (RoR) hydropower projects will be based on the ‘take and pay’ model. However, the Independent Power Producers’ Association, Nepal (IPPAN), has expressed concern that this declaration has closed the path for the construction of hydropower projects with a total capacity of 17,000 megawatts.

Despite it being clear that banks and financial institutions do not provide financing for PPAs based on the ‘take and pay’ model, the government has made a budget announcement that, according to IPPAN, effectively pushes the energy sector toward collapse.

“This declaration has not only blocked the construction of around 300 projects with a combined capacity of 17,000 megawatts, but also put at risk more than NPR 66.22 billion already invested by private developers in these projects,” stated IPPAN in a press release issued on Saturday.

IPPAN President Ganesh Karki said that the budget announcement has deeply discouraged the private sector, which has already invested over NPR 1.5 trillion in the hydropower sector and was preparing to invest more than NPR 3 trillion.

According to IPPAN, while the country’s electricity generation capacity has reached 3,600 megawatts, the private sector holds more than 80 percent of the share. The total capacity of run-of-river (RoR) projects that have applied for construction and survey permits from the Department of Electricity Development and are awaiting PPAs stands at 17,117 megawatts. Of this, only 190 megawatts worth of projects have been initiated by the Nepal Electricity Authority or the government, IPPAN stated.

“After the Department of Electricity Development issued permits and over NPR 66 billion has already been invested, the government’s budget announcement to allow PPAs only under the ‘take and pay’ model is seen by us as a highly anti-private sector move,” the statement reads. “Had the budget simply announced that it would open the door for the private sector to trade electricity, we could have found markets ourselves and proceeded with PPAs. However, instead of doing so, the provision presented in Parliament discourages the majority of the private sector, which is actively involved in RoR projects, and has created a sense of disillusionment within the private sector.”

IPPAN has demanded that the ‘take and pay’ provision, which it says is anti-private sector and aimed at eliminating private sector involvement in the energy sector, be immediately revised. It has called for the restoration of the environment for PPAs under the ‘take or pay’ model, which the Nepal Electricity Authority has been using from the beginning. Otherwise, IPPAN has warned that the private sector will launch a protest against the decision.

Nepal Electricity Authority spokesperson Rajan Dhakal said that although the provision has been mentioned in the budget, it has not been clearly defined. “It’s included in the budget, but it’s not clear,” he said. “The Ministry of Finance and the Ministry of Energy will likely clarify the matter.”

Source: Kantipur

[ 2 June, 2025 / nepalenergyforum.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries