energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Sunkoshi Marin Diversion Multipurpose Project’s 13.2 km tunnel completes

Energy Minister Khadka orders acceleration of remaining work

The Sunkoshi Marin Diversion Multipurpose Project in Sindhuli has finished building its 13.2-kilometer tunnel. The contractor firm has been directed to expedite the headworks project now that the tunnel is complete.

Deepak Khadka, Minister of Energy, Water Resources, and Irrigation, has ordered that the project be finished on time. Minister Khadka urged the contractor to expedite the work and guarantee the project's timely completion during his site visit and inspection.

Now that the project's 13.2-kilometer tunnel is complete, Energy Minister Khadka has directed the contractor company to expedite the completion of the headworks. In order to move the project forward, he has given the construction company instructions to adhere to a clear plan and work as per objectives.

The project will supply 10 percent of the total water for drinking, produce 32 megawatts of electricity, and irrigate 122,000 hectares.

The Department of Water Resources and Irrigation's Director General, Sanjeeb Baral, underlined the necessity of moving the project forward to reach the target. The fact that only 19% of the headworks have been finished, when 50% should have been finished by now, worried him. The contractor should finish the job by the deadline, he urged.

Baral also warned that the contract would be terminated if the work continues at the current pace. He stated that out of the Rs 14 billion project budget, Rs 1.20 billion has already been mobilized.

Raman Patel, representative of the contractor company Raman Construction, said delays in payments from the department have caused some slowdowns in the project. He assured them that with government support, they would complete the project on time.

On the same occasion, Energy Minister Khadka inspected the tunnel, powerhouse, and headworks of the project. The visit was also attended by Ministry officials, including Joint Secretary Sushil Chandra Acharya and Mitra Baral.

[ 4 June, 2025 / nagariknetwork.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries