energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  “Drilling Commences for Mugu Karnali Hydropower Project”

The drilling work has been initiated for the Detailed Project Report (DPR) of the Upper Mugu Karnali Hydropower Project.

According to geologist Surendra Timilsina, site engineer of the proposed project of Elevate Energy Pvt. Ltd., the drilling work has been started for a detailed study of the Upper Mugu Karnali Hydropower Project.

The Upper Mugu Karnali Dam is a much-awaited project with ambitious plans, including generating 306 megawatts of electricity from the Upper Mugu Karnali Hydropower Project, providing employment to the locals according to capacity, and operating large projects for irrigation in the vicinity, said Timilsina, engineer of Elevate Energy Pvt. Ltd.

Drilling is underway at Ganthe in Lums of Chhayanath Rara Municipality-12 with the aim of preparing the DPR within three years. The length of the drilling is 385 metres. He said that 19 metres of drilling work has been completed so far.

The proposed Upper Mugu Karnali Hydroelectric Project, an advanced project for the development of hydropower, waterways, and tourism in Mugu, is located in Lums of Chhayanath Rara Municipality and Mugumkarmarong Village Municipality of Mugu.

The Upper Mugu Karnali Hydropower Project is proposed to have a dam in Mugumkarmarong Rural Municipality. The dam will be constructed as a partial reservoir (picking-ROR) type.

In such type of dam, water is stored for four hours a day in the dam of this hydropower project. The company plans to operate the dam in electricity generation during times of high demand for electricity from the stored water and meet the demand.

Benefits for Mugu, employment for locals

According to Timilsina, they are still engaged in preliminary studies. He said that the project will be a multi-purpose project in the future. He said that it would be important to control and utilize unutilised water in hydropower production and provide irrigation facilities.

Timilsina said, “So far, the water of Upper Mugu Karnali has not been used. Once the project is operational, Mugali will benefit from sufficient irrigation. Once irrigation facilities are provided here, we can become self-reliant in agricultural production.”

According to him, many benefits can be derived from this project. “The reservoir will promote tourism and fisheries. Employment will be provided to locals during construction and after completion. Programmes will be implemented to benefit the community. Resettlement and rehabilitation work will also be carried out,” he said.”

He said that as it is a reservoir-based electricity generation, it will help meet the electricity shortfall during the dry season.

According to Sajan Aidi, Chief of the Nepal Electricity Authority, Mugu, the initiative for the construction of the Upper Mugu Karnali Hydropower Project is positive. He said that how to manage it is more important than the advantages and disadvantages of the project.

Source: Rising Nepal

[ 9 June, 2025 / nepalenergyforum.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries