energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  NEA In A Difficult Situation: MD Shakya

Hitendra Dev Shakya, Managing Director of the Nepal Electricity Authority (NEA), has stated that the authority is currently in a difficult situation. While addressing a program held in Kathmandu on Friday on the occasion of the 13th General Convention of the Nepal Electricity Authority Employees' Union, Shakya said that the challenges in maintaining efficient service delivery stem not from financial losses but from weak infrastructure.

According to Shakya, the current transmission and distribution systems are unable to handle the load. The NEA has been pushed into a difficult position due to these weak systems. He mentioned that investments in electrical infrastructure have been insufficient and emphasized the urgent need for more investment.

He posed the question, “If we are facing problems with 3,500 megawatts, what will happen when we aim to reach the target of 28,500 megawatts?” Shakya stressed that the NEA must be strengthened until at least 10,000 megawatts are achieved.

He said, "The Nepal Electricity Authority is currently in a difficult situation. This is not because it has gone into loss, but because it is in a compelling position to move forward. The government has set a target of 28,500 megawatts for progress and development. At present, our transmission and distribution systems cannot handle even 3,500 megawatts. Our system is that weak. There are frequent trips in the system. Today, a tree fell and a transmission line tripped. The system is tripping. Why couldn’t we make it stronger? Our financial condition and the required investment have been insufficient.”

As Nepal transitions from a least developed country to a developing one, Shakya said it will become harder to secure low-interest loans, making it challenging to build transmission and distribution lines. He added that without foreign aid, the NEA alone cannot sustain the sector and urged private sector cooperation.

[ 14 June, 2025 / Spotlightnepal.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries