energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Electricity of Rele Khola connected to national grid

The electricity generated from Rele Khola Hydropower Project with the capacity of 6 MW constructed in Annapurna Rural Municipality-4, Narchyang, Myagdi, has been connected to the national transmission line.

The electricity generated from the project has been connected to the transmission line through the Dana Sub-station constructed in Annapurna Rural Municipality-3 of the Dana-Khurkot transmission line since Saturday.

A joint team of technicians from the Nepal Electricity Authority, Department of Electricity Development, consultants, promoters and contractors have started electricity production after conducting the final testing of the equipment installed in the power house, said Project Director Darshanik Kafle.

"The generated electricity has been connected to the national grid through the Dana Sub-Station. We will start commercial production after the successful test production for 15 days," he said.

The electricity production has started after completing the construction of the physical structure of the project, which is promoted by HYM Consult Pvt. Ltd.

Sakura Power Construction, civil contractor, has constructed a dam at Kalokhola, two 50-50-metre-long water retention ponds at Khopra Lake, a power house at Relekherka, and a 3,600-metre-long pipeline from the dam to the power house.

The project has constructed a five-kilometre transmission line with a capacity of 33 kV connecting the Relekharka electricity switchyard and Dana substation.

Project Director Kafle said that a pipeline has been installed as an alternative to tunnels and canals.

The structures have been constructed and equipment has been installed to generate electricity by dropping water from a height of 510 metres to the power house.

The project, which began construction in 2079 BS with a target of completing it in two years, has been delayed by a year due to damage to the dam and intake built at Kalokhola by the flood that occurred on May 28, 2024.

Himalayan and Rastriya Banijya Bank have provided loans for the project, which is estimated to cost Rs. 1.35 billion.

This project has constructed a 13-kilometre access road from Beshigaun in Narchyang to Lekgaun to the dam and power house construction site.

By Thakur Prasad Acharya

[ 16 June, 2025 / risingnepaldaily.com ]¡¡¡¡¡¡
 
¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries