energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Tamakoshi Hydropower Begins Round-the-Clock Electricity Production

- With the partial repair of both sand-settling ponds damaged by the landslide completed, the project has resumed generating 456 megawatts of electricity.

- On October 28 last year, a landslide buried both desanders of the hydropower plant, along with the power operation control room and the underground tunnel.

The domestically funded Upper Tamakoshi Hydropower Project has begun generating electricity at full capacity around the clock. Following the partial repair of both sand-settling ponds (desanders) damaged by a landslide, the plant has resumed 24-hour electricity generation at its full capacity of 456 megawatts.

On October 28 last year, a landslide buried both desanders of the hydropower plant, along with the power operation control room and the underground tunnel (culvert). This caused significant damage to those structures, resulting in a three-month shutdown of electricity production.

Last January, after repairing the left-side desander among the two sand-settling ponds, the plant began generating electricity based on river flow by opening all the dam gates. Following the partial repair of the right-side desander, the plant started storing water at the dam site and resumed full-capacity operation, according to project manager Purnagopal Ranjit. He stated that since Thursday afternoon, the Upper Tamakoshi Hydropower Project has started generating 456 megawatts of electricity around the clock.

“We have brought the Tamakoshi Hydropower Plant into full operation,” said Ranjit. “The reconstruction has not yet been completed to restore it to its original state. However, to minimize losses during the three months of the monsoon, we have operated the plant by partially bringing both desanders into use.” He added that it will take another 45 days to fully complete the reconstruction of both desanders.

“Waiting another one and a half months for full reconstruction would have further increased the financial burden on the Tamakoshi company, so for now, we prepared the structures partially and resumed full-capacity generation,” he said. “The underground tunnel damaged by sediment has been repaired. By storing water in the dam, 456 megawatts of electricity will be generated around the clock until October.”

As it is the monsoon season, electricity generation will be carried out while also considering the risk of flooding, said Ranjit. The design discharge (water flow capacity) of the Tamakoshi Hydropower Plant is 66 cusecs. During the continuous rainfall last October, the flow of the Tamakoshi River at the dam site had reached 461 cusecs. According to the Power Purchase Agreement (PPA) signed with the Authority, the power plant must be shut down if the water flow exceeds 250 cusecs.

The construction of the power control room of the hydropower plant is currently underway. The landslide had completely destroyed the control room building, claiming the lives of two staff members and two army personnel. Upper Tamakoshi had filed an insurance claim worth NPR 1.8 billion for damages caused by the landslide to civil structures, electromechanical systems, and other equipment.

Tamakoshi has the capacity to produce electricity worth 40 million rupees per day. It has been facilitating load management by generating electricity according to demand for the Nepal Electricity Authority throughout the country during the winter season. In winter, the authority operates Tamakoshi as a backup for load management. The Upper Tamakoshi project, which is of the semi-reservoir (PROR) type, operates at full capacity during the monsoon and for four hours daily during winter.

During the winter season, Upper Tamakoshi Hydropower Company Limited is constructing a new project to divert water from the Rolwaling River to extend the hydropower plant’s full capacity operation to six hours. This project will generate an additional 22 megawatts of electricity. After power generation, the water from this project will be discharged into the Tamakoshi Hydropower Plant’s dam site.

Source: Kantipur

[ 28 June, 2025 / nepalenergyforum.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries