energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  6 MW Lower Likhu Cascade Hydropower Project Underway in Okhaldhunga

A 6-megawatt Lower Likhu Cascade Hydropower Project is set to be developed in Likhu Rural Municipality of Okhaldhunga district in Koshi Province.

The Department of Electricity Development has issued a 35-day notice to inform the public and gather feedback regarding the potential impacts of the proposed hydropower project at the construction site.

The project is being developed by Shret-Ganga Hydropower & Construction Limited. The design flow of the project is 29.75 cubic meters per second, with a total head of 25.65 meters and an installed capacity of 6 megawatts.

The project is expected to generate an average of 35.93 gigawatt-hours of electricity annually.

The proposed main physical structures of the project will be located on the left bank of the Likhu River in Ward No. 4 of Likhu Rural Municipality, Okhaldhunga district. To draw the required water for the project, a headpond measuring 14.89 meters in length, 4 meters in width, and 8.85 meters in height will be constructed just downstream of the tailrace canal of the Lower Likhu Hydropower Project.

The electricity generated by the project will be connected to the switchyard of the 28.1 MW Lower Likhu Hydropower Project through a 1.5 km long, 132 kV single-circuit transmission line from the project’s own switchyard. From there, the combined electricity generated by the 28.1 MW Lower Likhu Hydropower Project and the 6 MW Lower Likhu Cascade Hydropower Project will be transmitted to the national grid via the existing 22.5 km long, 132 kV transmission line connected to Nepal Electricity Authority’s New Khimti Substation.

The project is proposed to begin commercial electricity production from March 05, 2028.

Source: NepalPurbadhar

[ 7 July, 2025 / nepalenergyforum.com ]   
 
 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery LiFePO4 Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Battery Charger Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries