energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Tanahun Hydro's dam construction in full swing

The construction of the 140-megawatt Tanahun Hydropower Project under construction in Jhaputar of Rishing Rural Municipality-1, Tanahun, is moving in full swing.

Project chief Shyamji Bhandari said that work on the main dam is in full swing and 73,000 cubic metres of concrete have been constructed in a short period of time.

Bhandari said that out of the approximately 900,000 cubic metres of concrete required to be constructed for the main dam, 73,000 cubic meters have been constructed so far.

He said that the work for the concrete of the main dam began on March 20, 2025 and the work has been accelerated. Under the project's 'Package-1', the dam construction has been taken forward by diverting the Seti River in Vyas Municipality-5 and Rishing Rural Municipality-1, according to the project.

According to Bhandari, concrete blocks have been lifted to an average height of 10 metres above the foundation of the dam for the construction of the 140-metre-high dam.

As the temperature control of the large concrete of the high dam is considered very sensitive, the work is being done keeping that in mind. The foundation digging work began on November 6, 2023 and was completed in July 2024.

The work began by diverting the Seti River, which flows through the border of Rishing Rural Municipality-1 and Vyas Municipality-5, from the upper coastal area above the construction site of the 140-metre-high concrete main dam and constructing a 626.92-metre-long tunnel.

The water channeled through the diversion tunnel was released back into the Seti River through the lower coastal area from the main dam construction site. The construction of the 140-metre-high dam under Package-1 began on August 30, 2021, and the progress so far is 43.5 per cent.

According to Bhandari, the structural work inside the power house under 'Package-2' has been completed and equipment are being installed. He said that about 67 per cent progress has been made in the underground power house under 'Package-2' and 74 per cent in the construction of the transmission line under 'Package-3'. Project Chief Bhandari said that the work has been affected due to delays in the use of land in the forest area for the construction of the transmission line and the removal of trees and plants there.

For that, the project is conducting necessary consultations, coordination and facilitation with the concerned bodies, he said. The overall construction of the project is targeted to be completed by mid-July 2026. The total cost of the project is 505 million US dollars.

Of that, Asian Development Bank will bear US$ 150 million, Japan International Cooperation Agency (JICA) US$ 184 million, European Investment Bank US$ 85 million and the Government of Nepal/Nepal Electricity Authority US$ 86.

It is estimated that the project will generate an average annual electricity of 587.7 million units for the first 10 years after the start of electricity production and 489.9 million units thereafter.

[ 11 August, 2025 / risingnepaldaily.com ]¡¡¡¡¡¡
 

4th Nepal Electric, Power & Lights International Expo

¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries