energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  107 MW from Rahughat River connected to national grid

A total of 107.3 megawatts of electricity generated from three hydropower projects along the Rahughat River and its tributaries in Myagdi district has been successfully connected to the national transmission grid.

The construction of the three projects was recently completed by the private sector – Upper Rahughat Hydropower Project (48.5 MW), Chimkhola-Rahughat-Mangale Hydropower Project (37.5 MW), and Thulokhola Hydropower Project (21.3 MW).

All these projects fall within the Raghuganga Rural Municipality of the district.

The Upper Rahughat Hydropower Project, promoted by Tundi Power, has started trial production since Wednesday, having constructed the dam, tunnel, power house, transmission line, switchyard, equipment installation and internal testing.

Project Chief Indra Dhakal said that the project, which was started in 2020, was completed within the time frame due to the support and cooperation of the rural municipality and the local level.

The tunnel of this project, which has a dam at Chimkhola in Raghuganga Rural Municipality-7 and a power house at Dagnam, in Ward No. 4, is 4,900 metres long.

A 680-metre-long penstock pipeline has been installed from the outlet to the power house.

Similarly, the Chimkhola-Rahughat-Mangale Hydropower Project, also built by Tundi Power, has been in commercial production since June 2025.

Similarly, the Thulokhola Hydropower Project, built by Samyukta Urja Limited, has started commercial production since August this year.

The 40-MW Rahughat and 22.5-MW Upper Thulokhola Hydropower Projects, which are under construction on the Rahughat River, have reached their final stages.

Chairman of Raghuganga Rural Municipality Bhabha Bahadur Bhandari expressed his belief that the hydropower projects built in the rural municipality will open the door to development and prosperity. He said that the project has created employment at the local level, making the economic sector dynamic.

He added that once the project was completed, the rural municipality would start receiving electricity royalties and that the development of the municipality would gain momentum. Those affected by the project would be able to benefit from it by investing in shares, he said.

The electricity generated from the projects has been temporarily connected to the national transmission system from the switchyard of the Rahughat Hydropower Project located in Tilkenichour, Raghuganga Rural Municipality-3.

By Thakur Prasad Acharya

[ 20 September, 2025 / risingnepaldaily.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries