energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  MCA-Nepal Completes Signing of Contracts for 315 km Transmission Line

Millennium Challenge Account Nepal (MCA-Nepal) has signedthe contract for the construction of the final 117 km segmentof the electricity transmission line project of the Millennium Challenge Corporation (MCC) Nepal Compact,completing the award of all contracts for the construction of the full 315-kilometer transmission line under the compact marking a major milestone in the progress of Compact implementation.

The contract was signed with Ashish–Bozlar JV for the construction of the transmission line from Lapsiphedi Substation in Kathmandu district to Ratmate Substation in Nuwakot district and then onwards to New Hetauda Substation in Makwanpur district.

Following an international competitive bidding process, MCA-Nepal awarded the contract valued at approximately USD 76.65 million. The project includes the design, installation, testing, and commissioning of 400 kV transmission lines. The contractor is expected to complete the work within a contract period of 42 months.

Khadga Bahadur Bisht, Executive Director of MCA-Nepal, and Mr. Nirman Gauli, the representative of Ashish–Bozlar JV, signed the contract in the presence of officials from MCC and MCA-Nepal.

Speaking at the signing ceremony, Diane L. Francisco, MCC Resident Country Director, said, “The signing of this contract represents a wonderful milestone in the implementation of the Nepal Compact. This accomplishment is the result of the profound commitment and dedication of the MCA to the successful completion of this critical transmission line and its promise for the future development and prosperity of the Nepali people.”

Khadga Bahadur Bisht added, “MCA-Nepal has achieved a significant milestone in the implementation of the MCC Nepal Compact by signing this contract with Ashish–Bozlar JV today. It is a major achievement that all contracts for transmission line construction under the Electricity Transmission Project have now been awarded.”

Previously, MCA-Nepal had awarded contracts for the construction of a 198 km transmission line, covering the sections from Ratmate Substation in Nuwakot district to New Damauli Substation in Tanahu district, and then onwards to New Butwal Substation inNawalparasi (Bardaghart Susta West) district, with a final interconnection to the Nepal–India border with an 18 km segment. In addition, contracts have also been awarded for the construction of the Ratmate, New Damauli, and New Butwal substations.

The MCC Nepal Compact represents a landmark investment of $697 million in Nepal’s long-term economic development, laying the foundation for increased private sector investment. Through its Electricity Transmission and Road Maintenance Projects, the Compact aims to enhance connectivity and stimulate economic growth by strengthening critical infrastructure, facilitating cross-border energy trade, and improving Nepal’s transportation network

[ 26 September, 2025 / Spotlightnepal.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries