energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Lightning-Damaged Singti–Bahrabise Line Back in Service

The Singti-Bahrabise transmission line, which was damaged by lightning, has resumed operation after repairs. With the transmission line back in operation, 89 megawatts of electricity generated from hydropower projects in Dolakha has once again been fed into the national transmission line.

On Wednesday afternoon, lightning accompanied by a storm damaged Tower No. 32 of the 132 kV Singti-Bahrabise transmission line, disrupting 89 megawatts of electricity from five hydropower projects. To meet the electricity demand during the festival period, the transmission line was temporarily repaired and brought back into operation as an alternative measure, said Manoj Sah, Chief of the Khimti Grade Branch.

The branch has been overseeing six substations in Ramechhap, Dolakha, and Sindhupalchok. According to him, the lightning-damaged conductor at Tower No. 32, located in Kalinchok Rural Municipality-7 of Dolakha, along the 132 kV Singti-Bahrabise transmission line, has been temporarily restored by connecting it as a single circuit and is now in operation for the time being.

Since electricity demand is high during the festival period, we have repaired the transmission line as a temporary solution,’ he said. ‘Work on the double-circuit line is ongoing, and a permanent solution will be implemented at that time.’ He added that with the transmission line back in operation, 89 megawatts of electricity from five privately-owned hydropower plants have been fed into the national transmission line.

Electricity generated from privately-owned hydropower plants in the northern region of Dolakha is transmitted from the Singti substation to the Bahrabise substation via the 132 kV transmission line and fed into the national grid. Sah stated that preparations have begun to operate this transmission line as a double circuit after the Dashain festival, as it is currently running on a single circuit.

[ 27 September, 2025 / nepalenergyforum.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries