energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  IPPAN Calls for Immediate PPA Approval to Boost Hydropower Development in Nepal

The Independent Power Producers’ Association, Nepal (IPPAN) has submitted 13 demands to the Nepal Electricity Authority (NEA), including the immediate approval of Power Purchase Agreements (PPAs) for projects with a total capacity of 13,000 megawatts that have already applied for connection agreements and PPAs.

On Sunday, a delegation led by IPPAN President Ganesh Karki, who had gone to congratulate newly appointed Managing Director of the Nepal Electricity Authority, Manoj Silwal, submitted the demands, including the opening of PPAs for all projects that have so far applied for connection agreements and PPAs.

Before the approval of the fiscal year mid-July 2025 to mid-July 2026 budget, although PPAs for all projects smaller than 10 megawatts were opened, the demand has been made to immediately open the PPAs for run-of-river (ROR) projects where the “take-and-pay” provision was withheld in the budget. They have also demanded assurance of PPAs for around 15,000 megawatts worth of projects currently in the study phase, which are facing difficulties in moving forward due to the lack of PPA certainty.

Similarly, it has been demanded that the final Required Commercial Operation Date (RCOD) of hydropower projects that are unable to generate electricity within the stipulated time due to reasons such as floods and landslides, earthquakes, economic recession, shortage of explosives, delays in land acquisition, and delays in obtaining tree-cutting permits, be extended by three years. Likewise, they have also demanded the cancellation of the provision that places projects under contingency operation citing reasons like the lack of transmission lines.

While receiving congratulations and IPPAN’s demands, NEA Managing Director Silwal said that the Authority and the private sector must move forward together.

“We must move together; neither can function without the other. If we walk separately, both will sink,” he said. “The Electricity Authority will move forward seriously regarding the problems of the private sector. PPAs should be advanced by considering the electricity trade agreement with India and the state of electricity consumption.”

He stated that the Authority is ready to work impartially and in accordance with regulations, adding that force majeure is an appropriate reason for extending the RCOD deadline. He also urged that, if delays occur for other reasons, the Authority should be informed immediately.

“If for any reason the project is delayed in commencing operations, inform us right away. If both parties hold a joint meeting - even virtually - and move forward with the reasons, the RCOD deadline can be extended,” he said.

Managing Director Silwal said that since matters such as the new PPA rates need to be decided by higher authorities, the Authority is ready to facilitate the process for that.

AnnapurnaPost

[ 29 September, 2025 / nepalenergyforum.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries