energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Kulekhani Water Shortage Could Impact Nepal’s Electricity Generation

On the same date last year, Kulekhani reservoir was brimful, forcing authorities to open its sluices. The sudden release swept away roads and more than two dozen homes in downstream settlements. This year, on the very same date, the reservoir stands far from capacity.

As of Sunday morning, the water level in Kulekhani’s Indrasarovar reservoir was measured at 1,504.21 metres. With a full storage elevation of 1,530 metres, that leaves about 26 metres yet to fill. Heavy rains usually during monsoon months are vital to raising the reservoir level, but this year’s rainfall has failed to push it even halfway. While in a normal monsoon the surface would rise daily by 50 to 75 centimetres, this year it struggles to grow by even 20 cm. Last year on September 27 alone, water level jumped as much as 5 metres in one day.

“In the catchment area, there is barely any rainfall now,” said Tara Datta Bhatt, chief of Kulekhani-I Hydropower Project. “We are already past the last week of September, and the forecasts suggest it will be very hard for the reservoir to fill. With only normal rains, it is unlikely we’ll ever reach capacity this season. Only widespread, uneven showers can push it.”

When levels are low, the consequences ripple outwards. The hydropower project is currently not in operation as water is reserved for the dry season. If the reservoir fails to fill, electricity generation in the dry season will suffer.

Both the locals and visiting tourists in Markhu and Chitlang - who come expecting scenic water views - have been turning back disappointed.

Fields in areas usually submerged by the reservoir now sprout green grass instead of water. “We need rainfall as it was in September last year,” said a senior technician at the project. “Only that kind of concentrated downpour will refill the reservoir; the rain now won’t do much.”

The Kulekhani reservoir is about 7 kilometres long and 300 metres wide, with a total holding capacity of some 85.3 million cubic metres. It supports three hydropower plants: Kulekhani-I (60 MW), Kulekhani-II (32 MW) and Kulekhani-III (14 MW). The drawdown limit for power generation is 1,484 metresbelow which water becomes unusable for power generation.

Historically, the reservoir has struggled in underperforming monsoons. In 2023, for example, Kulekhani remained well under capacity even after the monsoon season had passed. Back in 2016, Nepal Electricity Authority (NEA) had been criticised for overusing the reservoir during dry spells, which pushed levels dangerously low.

If the reservoir cannot replenish itself sufficiently this year, the downstream effects could be serious. As a backup to Nepal’s power grid, Kulekhani’s ability to generate energy is crucial when run-of-river plants underperform in dry months. Prolonged shutdowns could mean power shortfalls or load shedding for many consumers.

ANN

[ 30 September, 2025 / nepalenergyforum.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries