energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  IPPAN demands relief package from customs exemption to RCOD timeline extension

The Association of Power Producers, Nepal (IPPAN) has demanded various relief packages for hydropower projects affected by floods.

At the meeting with the Minister of Energy, Water Resources and Irrigation, Kulman Ghising, on Wednesday, IPPAN representatives emphasized that the government should announce a relief package for the reconstruction of hydropower projects damaged by floods.

According to a press release issued by the ministry today, Minister Ghising stated that he would make efforts to provide maximum relief to the flood-affected projects. The minister also informed that he would present solutions to energy projects related to forests in the upcoming cabinet meeting.

IPPAN chair Ganesh Karki called for a relief package that considers all projects damaged by the floods occurred on June 15 and 16, 2023, the floods and landslides on different dates in June-August and on September 27-28 in 2024 and on different dates in June-August as well as on October 3-4, 2025, covering issues such as the date to start electricity production (RCOD), license duration, loan restructuring, long-term financing, and customs duty exemptions.

IPPAN's demands

IPPAN has demanded that necessary machinery and equipment for the reconstruction and maintenance of flood-affected projects should be allowed to be imported with a one percent customs duty.

IPPAN has also demanded that the RCOD period of under-construction projects damaged by floods be extended by three years and the validity of the permit by five years, and that arrangements should be made for the restructuring and refinancing of loans of flood-affected projects.

Similarly, IPPAN has called on the government to make provision for the rapid issuance of the halted IPO and rights shares of flood-affected projects, and to declare hydropower projects damaged by natural disasters as 'crisis-ridden' to take necessary policy decisions.

Among the seven demands of IPPAN, include the need to arrange long-term financing for flood-affected projects and to abolish the provision of the projects automatically converting to 'take and pay PPA' if they fail to generate electricity within the fiscal years 2025/26–2027/28.

[ 9 October, 2025 / risingnepaldaily.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries