energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Sri Lanka Secures $52M Loan for Power Transmission Project

Sri Lanka has secured a $52 million loan from the Asian Infrastructure Investment Bank (AIIB) to support the Kerawalapitiya–Port L Second Transmission Line Project, marking AIIB’s first energy sector project in the country.

The sovereign-backed financing will fund the design, supply, construction, testing, and commissioning of a 220 kilovolt (kV) single-circuit underground cable system. This new line will link the Kerawalapitiya Switching Station with the Colombo Port L Grid Substation, complementing the first underground cable along this route, which was commissioned in 2019.

The project aims to enhance the reliability and capacity of Sri Lanka’s electricity transmission network, enabling smoother power flow and supporting the country’s growing energy demands. The underground design is expected to improve operational resilience and reduce maintenance requirements compared with overhead lines.

AIIB noted that the loan reflects its continued commitment to sustainable infrastructure development in Sri Lanka. The bank has previously supported five projects in the country across the energy and urban sectors, providing a total of $534 million in financing to drive economic growth and development.

The Kerawalapitiya–Port L project is expected to strengthen grid stability, reduce transmission losses, and support long-term energy planning. By connecting key substations through a modern underground system, the initiative also aligns with Sri Lanka’s broader objectives for reliable and resilient power supply.

This financing underscores AIIB’s role in supporting infrastructure modernization in Asia, particularly in energy transmission, where improved networks are essential for economic development and urban growth. The successful commissioning of the first underground cable in 2019 demonstrated the feasibility and benefits of such systems, paving the way for the expansion with the second line.

Once completed, the project will provide redundancy and increased capacity along the Kerawalapitiya–Port L corridor, ensuring that electricity supply remains stable even during peak demand or maintenance activities. The underground design also minimizes environmental and visual impacts, aligning with sustainability goals.

With this project, Sri Lanka is expected to enhance energy security and operational efficiency while fostering conditions for future grid expansions. AIIB’s financing is a key step toward supporting long-term, resilient infrastructure that can accommodate growing urban and industrial electricity consumption.

The project is anticipated to contribute significantly to Sri Lanka’s efforts to modernize its energy network and strengthen connectivity between critical substations, supporting both domestic consumption and broader economic development.

by asian-power

[ 13 October, 2025 / world-energy.org ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries