energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  NEA assures no power cuts as electricity demand in Tihar expected to hit 1,600 MW

Nepal Electricity Authority (NEA) has assured that there will be no power cuts during Tihar, the Hindu festival of lights, which is just around the corner.

The NEA has estimated that electricity consumption will peak at around 1,600 MW on Laxmi Puja, the main day of Tihar, which falls on Monday. The figure is similar to the electricity demand recorded on the same day last year.

NEA Spokesperson Rajan Dhakal said the authority is fully prepared to manage peak-hour demand during the festival. According to him, while household electricity use typically surges during Tihar, industrial consumption declines, balancing overall demand.

Last year, the peak demand on Laxmi Puja reached 390 MW in the Kathmandu Valley. The NEA began phasing out load-shedding in 2016, starting with Laxmi Puja as a trial. Following successful implementation, Nepal was officially declared load-shedding-free in May 2018.

Dhakal said the NEA has instructed all concerned officials to remain on high alert to minimize possible power disruptions caused by issues in the distribution system. “To prevent any interruptions, distribution center heads, power plant managers, and technical staff nationwide will remain on standby,” he said.

Recent floods triggered by incessant rainfall affected more than a dozen privately operated power projects, disrupting the production of over 105 MW of electricity. However, the NEA said this will not impact power supply during Tihar, as state-owned hydropower plants remain unaffected.

Meanwhile, Nepal earned over Rs 8.64 billion from electricity exports to India and Bangladesh during the first two months of the current fiscal year (FY), up by 10.5 percent from Rs 7.82 billion in the same period last year.

Nepal has been exporting 40 MW of electricity to Bangladesh and around 1,000 MW to India during the peak generation season. In FY 2024/25, the country earned Rs 17.45 billion from electricity exports.

[ 16 October, 2025 / nagariknetwork.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries