energyNP.com  
Tel
98510-91900 
Email
energyNP@hotmail.com 
Menu

 
 
News  
Back to energy news list >>>
 

 
 
 Air Conditioner
 Battery
 Booster Pump
 Charger
 Cold Storage Room
 Electric Power Tools
 Electric Water Heater
 Garbage Disposal
 Station
 Generator
 Heat Pump
 Inverter
 Power Supply
 Rectifiers
 Self Priming Pump
 Solar Energy
 Solar Water Heater
 Transformer
 Treadmill
 UPS
 Voltage Stabilizer
 Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  Hulas Steel and Ashok Steel begin paying long-pending premium electricity dues to NEA

Two major industrial firms based in Simara, Bara - Hulas Steel Industries and Ashok Steel Industries - have begun clearing their long-overdue premium electricity tariff dues owed to the Nepal Electricity Authority (NEA) for power consumed through dedicated and trunk line connections.

According to NEA Executive Director Manoj Silwal, Hulas Steel Industries has started paying its outstanding premium electricity charges amounting to Rs 141.2 million (14 crore 12 lakh) for the period between Magh 2072 and Baisakh 2075. The company received NEA approval to clear the dues in 28 monthly installments, each amounting to Rs 5.043 million (50 lakh 43 thousand).

“Hulas Steel has already submitted the first installment this Friday,” said Executive Director Silwal, confirming that the industrial group had officially initiated the repayment plan after nearly a decade-long delay in settling the premium electricity fees.

Similarly, another major steel producer in the Simara industrial corridor, Ashok Steel Industries, has also cleared its first installment toward its Rs 175.8 million (17 crore 58 lakh) outstanding dues. The company was granted the same 28-installment repayment facility and has deposited its first payment of Rs 6.3 million (63 lakh) with NEA.

Background: Long-Standing Industrial Dues Under NEA’s Dedicated Line Scheme

Under NEA’s dedicated and trunk line electricity system, high-consumption industrial entities receive prioritized power supply to ensure uninterrupted production, often at a premium tariff rate higher than normal industrial users. However, several industries had failed to clear their dues from the period of 2015 to 2018, when power supply disruptions were frequent and billing disputes arose during the nationwide load-shedding phase.

The issue gained renewed attention after the NEA’s financial audit flagged unrecovered premium tariff amounts as a major compliance concern. In response, the NEA’s board approved a structured installment payment mechanism to recover arrears without halting industrial operations.

[ 17 October, 2025 / fiscalnepal.com ]   
 

Electric Folded Treadmill | Kathmandu | Nepal

 SYSTEM
 Backup System
 Solar System
 Wind Power System
 Heating System

 AC & Ventilation
 System

 Cold Room System
 Charging System
 for
 Telecom/Industry
 Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int’l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries