energyNP.com  
Tel
98510-91900¡¡
Email
energyNP@hotmail.com¡¡
Menu

 
 
News  
Back to energy news list >>>
 

 
 
¡¡Air Conditioner
¡¡Battery
¡¡Booster Pump
¡¡Charger
¡¡Cold Storage Room
¡¡Electric Power Tools
¡¡Electric Water Heater
¡¡Garbage Disposal
¡¡Station
¡¡Generator
¡¡Heat Pump
¡¡Inverter
¡¡Power Supply
¡¡Rectifiers
¡¡Self Priming Pump
¡¡Solar Energy
¡¡Solar Water Heater
¡¡Transformer
¡¡Treadmill
¡¡UPS
¡¡Voltage Stabilizer
¡¡Wind Energy

 
Portable Electric Car Charger | Portable EV Charger | Portable Charger for Home Use | Charging Station for Home Use | Kathmandu Nepal
 
Electric Folded Treadmill Nepal Kathmandu
 
Gree Air Conditioner Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Solar Water Heater Nepal Kathmandu
 
Gree Air Purifier Kills Novel Coronavirus Nepal Kathmandu
 

 

 
  335 MW Humla Karnali Second Hydropower Project set to be built in Humla

The necessary steps for the development of the Humla Karnali Second Hydropower Project, which boasts a total capacity of 335 MW, have commenced in the economically lagging Humla district.

Currently, the Environmental Impact Assessment (EIA) is in progress. The Ministry of Forests and Environment has initiated the EIA based on recommendations from the Ministry of Energy, Water Resources, and Irrigation. The Ruru Hydropower Project will oversee the construction. This project will be situated in the Kharpunath and Sarkegad Rural Municipalities of Humla.

Previously, the Ministry of Forests and Environment sought public input regarding the EIA through a public notice. A total of 47.13 hectares of land will be necessary for the project's construction. According to the Environmental Protection Act, 2076 BS, hydropower projects exceeding 50 megawatts must undergo an Environmental Impact Assessment (EIA).

Consequently, the EIA work is being conducted, and the Ministry is currently undertaking the required studies. The project is a significant initiative within the Karnali River Basin. As it will be constructed on the Humla Karnali, a perennial glacier-fed river, its importance is underscored. The design discharge for the proposed project is set at 118.70 cubic meters per second. The project will also feature the construction of two diversion tunnels, measuring 545 meters and 542 meters in length, respectively.

The diversion tunnel will have a diameter of 9.5 meters. It is anticipated that the project will produce 609.89 gigawatt-hours of energy during the dry season and 1,184.83 gigawatt-hours during the rainy season. The electricity generated will be transmitted to the Mugu Karnali Hub via a 20-kilometre-long double-circuit 400 kV transmission line.

[ 24 October, 2025 / nagariknetwork.com ]¡¡¡¡¡¡
 

Electric Folded Treadmill | Kathmandu | Nepal

¡¡SYSTEM
¡¡Backup System
¡¡Solar System
¡¡Wind Power System
¡¡Heating System

¡¡AC & Ventilation
¡¡System

¡¡Cold Room System
¡¡Charging System
¡¡for
¡¡Telecom/Industry
¡¡Substation System

 
Voltage Stabilizer Nepal Kathmandu
 
UPS Nepal Kathmandu
 
Lithium iron battery Battery Nepal Kathmandu
 
Inverter Hybrid On-grid Off-Grid Energy Storage Solar Inverter Nepal Kathmandu
 
Solar Energy - Nepal Kathmandu
 
Complete Power Solution
 
 
 
 
Solar Water Heater Nepal Kathmandu Solar Energy Nepal Kathmandu Wind Power Nepal Kathmandu Power Generator Nepal Kathmandu Voltage Stabilizer Nepal Kathmandu Transformer Nepal Kathmandu AirConditioner Nepal Kathmandu Battery Nepal Kathmandu UPS System Nepal Kathmandu Rectifier Nepal Kathmandu
 
 
Link: The Official Portal of Goverment of Nepal Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow Nepal! Nepal Global Buying SIMONES Industries|Nepal Power Solution
  Nepal Goverment Nepal Electricity Authority Nepal Alternative Energy Promotion Centre Nepal Telecom Nepal Department of Agriculture Nepal Department of Industry wow-Nepal | Nepal Global Buying SIMONES Industries |Nepal Power Solution
 
Fair: Investment Summit Nepal Himalayan Hydro Expo Nepal Kathmandu China International Import Expo China Import and Export Fair China-South Asia Exposition Guangzhou Int¡¯l Refrigeration, Air-Condition, Ventilation, Air-Improving Equipment Exhibition Guangzhou International Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
  Investment Summit Nepal Himalayan Hydro Expo Nepal China International Import Expo China Import and Export Fair China-South Asia Exposition Int'l Refrigeration, Air-Condition Fair Int'l Solar Photovoltaic Exhibition Asia Battery Sourcing Fair
 
Copyright @ 2014 All right reserved. Simones Industries